Similar Projects
Oasis Water Treatment Plant Improvements - CIPWA61055 - City of Glendale
Infrastructure
Conception
Glendale, AZ 85303

Underground Storage Tank Replacement - Cipfc19037 - City Of Glendale
Alteration
Conception
$615,000 est. value
Glendale, AZ 85301

Donovan Tank, Bull Tank & Government Tank-Stock Tank Cleaning
Infrastructure
Sub-Bidding
Tucson, AZ 85602

Livestock Storage Tanks
Post-Bid
Aguila, AZ

Hospital Hill Tank Renovation
Post-Bid
Hayden, AZ

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Thunderbird Reservoir - CIPWA61045
Alteration
Conception
$2,350,000 est. value
Glendale, AZ 85310

Tank Inspection, Repair, and Coating
Alteration
Post-Bid
Glendale, AZ

Pefo Replace Water Tank Ladder
Results

Rancho Santa Fe Reservoir Coating Repairs and Rehabilitation - 1539 - City of Avondale
Renovation, Infrastructure
Conception
Less than $1,460,000 est. value
Avondale, AZ 85392

Cactus Forest Water Distribution System Replacement
Infrastructure
Post-Bid
AZ

Demolition of Existing Steel Water Storage Tank
Results
Canyon Day, AZ - Albuquerque, NM 85941

Central Avenue Water Tank
New Construction, Infrastructure
Conception
$5,000,000 est. value
Phoenix, AZ 85085

Welded Steel Water Tank
Infrastructure
Post-Bid
Cottonwood, AZ

Last Updated 07/18/2022 09:32 AM
Project Title

Main Tank #4 Construction - City of Kingman

Physical Address View project details and contacts
City, State (County) Kingman, AZ   (Mohave County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a water / sewer project in Kingman, Arizona. Conceptual plans call for the construction of a water / sewer project. This project is for the construction of Main Tank #4. This project is in included in the City of Kingman FY 2022-2023 Capital Improvement Plan (CIP). As of July 15, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents