Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

300 West Downtown Storm Drain - Phase I - City of Provo
Infrastructure
Conception
Less than $1,750,000 est. value
Provo, UT 84604

Harvest View Park Phase 2 - Site Construction
Renovation
Post-Bid
Santaquin, UT

Contractor Pre-Qualification Packet - Reuse Project
Infrastructure
Post-Bid
Orem, UT 84058

Power Department Building
Results
Salem, UT 84653

Power Building Site Work
Results
Salem, UT 84653

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Carterville Storm Drain Outfall - City Of Provo
Infrastructure
Conception
Less than $2,500,000 est. value
Provo, UT 84603

2021 CDBYI Project (Community Development Building Yard Improvements)
Infrastructure
Post-Bid
Eagle Mountain, UT 84005

Duchesne MS4
Term Contract
Results
Duchesne, Orem, UT 84057

Franklin Park Outfall - City of Provo
Infrastructure
Conception
$1,875,000 est. value
Provo, UT

Freedom Bus Garage Excavation Services
Alteration
Post-Bid
Provo, UT 84601

2021 Provo City Grandview 1200 North Storm Drain Project
Results
Provo, UT 84604

Reported 06/21/2022 02:28 PM
Project Title

500 North - Independence Avenue to 600 West - City of Provo

Physical Address View project details and contacts
City, State (County) Provo, UT 84606   (Utah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2027
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Provo, Utah. Conceptual plans call for site work for a water / sewer project. This would install a new Storm Water mainline in 500 N from 600 West to the Provo River at Independence Avenue. The area experiences drainage issues, and the old network of irrigation and sumps needs to be replaced with a fully functioning storm line with inlets. The project is included in the City of Provo's FY 2023-2027 Capital Improvement Program (CIP). As of June 17, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents