Similar Projects
Mayfield and South Franklin Street Waterline Replacement Project
Infrastructure
Bidding
$200,000 est. value
Elizabethville, PA 17023

Walnut Street Stormwater Improvement Project
Post-Bid
Millersburg, PA 17061

Decorative Fountain Maintenance
Post-Bid
Harrisburg, PA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Rheems Water Main Replacement
Results
Elizabethtown, PA

Septic Tank Service 2022 and 2023
Term Contract, Infrastructure
Post-Bid
PA

Leachate Seep Spray Sprinkler System
Results
Hershey, PA 17033

Service Maintenance Contract for Wastewater Collection System
Term Contract
Post-Bid
Harrisburg, PA 17111

Maintenance an Emergency Repairs to Water Distribution System
Results
Elizabethtown, PA 17022

Front Street Interceptor Improvements Phase 2
Infrastructure
Post-Bid
$500,000 est. value
Harrisburg, PA

Spring Creek 1 Trunkline Replacement
Results
Harrisburg, PA

2022 Water System Improvements Project
Infrastructure
Post-Bid
Harrisburg, PA

Water Distribution System Improvements
Results
Millersburg, PA

2021 Water System Improvements Project
Results
$2,600,000 to $2,900,000 est. value
Harrisburg, PA

Market Street Water Main Replacement Project - General Construction
Results
$420,000 to $450,000 est. value
Halifax, PA 17032

Reported 05/07/2022 12:00 AM
Project Title

Sewer and Water Maintenance

Physical Address View project details and contacts
City, State (County) Harrisburg, PA   (Dauphin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Capital Region Water-owned utilities, including but not limited to Capital Region Water's existing sanitary, combined and storm sewer collection and conveyance systems and water distribution system to include repair of existing facilities, upon issuance of a Work Order by Capital Region Water. The Work of this Contract is intended to include "dig-up" and "open cut" or "excavation" type maintenance work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents