Similar Projects
Oakwood Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Montessori Radmoor School
Addition - 5,635 SF
Design
Okemos, MI 48864

Scripps Elementary School - Lake Orion Community Schools
Renovation
Design
$4,000,000 est. value
Orion Township, MI 48360

Construction Manger - Doyle-Ryder Elementary School
Renovation
Bidding
$2,750,000 est. value
Flint, MI 48503

Cook Elementary Renovations
Renovation
Post-Bid
Grand Blanc, MI 48439

Morley Stanwood Schools Series 1
Post-Bid
Morley, MI

Atkins Elementary Kitchen-Cafeteria Renovations
Results
Bridgeport, MI

Alpena Public Schools 2020 Bond Project BP 1
Results
Alpena, MI

Waterford Montessori Academy, Elizabeth Lake Campus - Building Addition
Addition - 21,628 SF
Construction
Waterford Township, MI 48328

RUSD 2022 Bond Projects - Future Phases
Renovation
Design
$34,500,000 est. value
MI

Boyne City Schools Construction
Renovation, Addition
Post-Bid
Boyne City, MI 49712

Willow Hill Elementary School Renovation- PHASE III
Renovation
Results
Traverse City, MI

Michigan Math and Science Academy
Renovation - 59,680 SF
Post-Bid
Warren, MI 48092

Thomson Elementary Addition
Addition - 2,130 SF
Results
Davison, MI 48423

Clio Elementary Renovations and Additions
New Construction, Renovation, Addition
Post-Bid
Clio, MI 48420

Reported 06/29/2022 12:46 PM
Project Title

Edison Elementary - 2022 Bond - Kalamazoo Public Schools

Physical Address View project details and contacts
City, State (County) Kalamazoo, MI 49008   (Kalamazoo County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Conceptual plans call for the construction of a educational facility. A more detailed scope is expected to be released on a future date. As of June 28, 2022, this project is in the conceptual phase. The bond has been approved. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Per the owner, a firm timeline for construction has not been established, bidding and construction will occur over the next 5 to 7 years. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents