Similar Projects
Cronus Chemicals Fertilizer Plant
LEED Certification, New Construction, Infrastructure
Design
$1,762,000,000 CJ est. value
Tuscola, IL 61953

Village of Arthur Clarifier Improvements & Select Plant Demolition
Demolition, Renovation, Infrastructure
Bidding
$250,000 CJ est. value
Arthur, IL 61911

Douglas County Animal Shelter
Addition, Demolition, New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Tuscola, IL 61953

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RR-21-4821 Pavement Repairs
Infrastructure
Results

9.194 Miles of Smart Resurfacing from Madison Street in Philo to Ncl of Villa Grove
Infrastructure
Results

Exterior Concrete Demo and Replacement: Douglas County Courthouse
Renovation, Infrastructure
Construction
$232,590 CJ est. value
Tuscola, IL 61953

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Class A Pavement Patching in East Field Area for a Total Length of 30.54 MI
Infrastructure
Results

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

8.257 Miles of Smart Resurfacing from ECL of Arthur to US 45
Infrastructure
Results
Arcola, IL

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

CM Shoulder Repair from Vine St in Arthur to CR 100 E of Arthur
Infrastructure
Results
IL

RFQ - Various Phase II Traffic Signal Coordination and Timing (SCAT) Projects, Various Routes
Term Contract
Post-Bid
$300,000 CJ est. value
Springfield, IL 62703

Last Updated 04/29/2023 05:04 PM
Project Title

Resurfacing - IL 133

Physical Address View project details and contacts
City, State (County) Arthur, IL 61911   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,461,273 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

8.6 miles of resurfacing on IL 133 from IL 32 at Lovington to the Douglas County line. Region : 4 District : 7 VBP % : 0.00 Federal Project # : STP1AVQ(632) County(s) : Moultrie Key Route(s) : FAP 749 Marked Route(s) : IL 133 Section(s) : 119RS-3 State Job #(s) : C-97-087-22 PPS #(s) : 7-52812-0000 50 Working Days Questions not accepted as of April 18, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 050 - Resurfacing - IL 133 The work on this project is located from IL 32 at Lovington to Douglas County line on IL 133. The work on this project consists of 8.60 miles of SMART overlay, including patching, milling, paving, thermoplastic marking, and paint pavement marking.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents