Similar Projects
Tenafly Culvert Repairs Project
Results
Tenafly, NJ

Wild Duck Pond Restoration
Results
Ridgewood, NJ 07450

Bollard Installation at Dogwood Hill ES and Manito ES
Infrastructure
Bidding
Oakland, NJ

Brandywine/Valley Forge Drainage Improvement - Phase 3
Post-Bid
Ho Ho Kus, NJ 07423

Crescent Park Drainage Improvements
Post-Bid
Wallington, NJ 07057

Restoration of Huff Pond
Results
Montvale, NJ 07645

Drainage Restoration Contract, Statewide -2019
Results
$5,000,001 to $10,000,000 est. value

Yale Way Drainage Improvements
Results
Oakland, NJ 07436

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Parking Lot Resurfacing and Drainage Improvements at Woodside ES
Results
River Vale, NJ 07675

NS95L Non-Vegetative Areas Milepost 120.6 to 121.3
Results
$490,659 est. value
Englewood, Fort Lee, Leonia, NJ

Paramus East Brook School Front Parking Lot Drainage and Repave
Results
Paramus, NJ 07652

Arrowhead Lane Culvert Replacement
Results
Saddle River, NJ 07458

Replacement of Blanch Avenue Culvert Over Dwars Kill Borough of Closter and Borough of Norwood Bergen County
Alteration
Post-Bid
Closter, NJ 07624

Maintenance Timber and Underwater Structural Repair Contract, North - 2021
Results
$5,000,001 to $10,000,000 est. value

Last Updated 08/03/2021 04:27 PM
Project Title

Restoration of Sprout Brook

Physical Address View project details and contacts
City, State (County) Hackensack, NJ   (Bergen County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes the removal of sediment and debris along Sprout Brook, and the re-stabilization of 9 outfalls. This includes installing 4 headwalls, 1 flared end section, 4 scour holes and conduit outlet protection along 5 outfalls. All NJDEP permits and Soil Conservation approvals will be provided by the Township to the lowest bidder upon award of contract. Principal items of work in the project include: L.S. Clearing Site 430 C.Y. Sediment Excavation 4 Unit Headwall 1 Unit Flared End Section 4 Unit Scour Holes 1,130 S.F. Conduit Outlet Protection, 16" Thick (D50=8") 234 S.F. Scour Hole, 12" Thick (D50=6").

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents