Similar Projects
Interstate 494, Bush Lake Road to Interstate 35W (Metro District) - 2785-424 - Minnesota Department of Transportation
New Construction, Infrastructure
Conception
$190,500,000 est. value
Bloomington, MN 55438

Interstate 494, Bush Lake Road to Interstate 35W (Metro District) - 2785-424 - Minnesota Department of Transportation
New Construction, Infrastructure
Conception
$190,500,000 est. value
Bloomington, MN 55438

Rivers Edge Assisted Living
New Construction, Infrastructure - 28,598 SF
Design
$8,000,000 CJ est. value
Brooklyn Park, MN 55443

Tessman Ridge Apartments
New Construction, Infrastructure - 126,470 SF
Design
$20,400,000 CJ est. value
Brooklyn Park, MN 55445

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

P143 Intelligence Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 9,200 SF
Post-Bid
$15,000,000 CJ est. value
Minneapolis, MN 55450

2021 Street Surface Improvements
Results
$500,000 est. value
Hopkins, MN

2022 Street and Utility Improvements
Infrastructure
Results
$3,000,000 est. value
Hopkins, MN

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

PetSuites / Maple Grove
New Construction, Infrastructure - 11,000 SF
Design
$2,500,000 CJ est. value
Maple Grove, MN 55311

Walgreens #16279 / Minneapolis
New Construction, Infrastructure - 75,000 SF
Post-Bid
$20,000,000 CJ est. value
Minneapolis, MN 55406

2022 Trunk Watermain Improvements
Infrastructure
Results
$3,300,000 est. value
Hopkins, MN

Last Updated 01/04/2024 07:35 AM
Project Title

Highway 610 Extension to CR 30 at I-94

Physical Address View project details and contacts
City, State (County) Maple Grove, MN 55369   (Hennepin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Park/Playground, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $48,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 1 2022 this project is in working drawings and should start fall of 2022. Work includes construction of a new four-lane divided roadway between County Road 30 and Hwy. 610. County Road 30 would be realigned to form a new signalized intersection with County Road 610, and a traffic signal would be installed at the proposed County Road 610/eastbound I-94 on-ramp intersection. There would also be a multi-use trail constructed along the south side of the future County Road 610. Additionally construction access roads from westbound Hwy. 610 to eastbound I-94, including a bridge over the Hwy. 610 connect to I-94 and bridges over I-94, an access from westbound I-94 to the future westbound County Road 610, and other connections would be needed. Along with creating an auxiliary lane on I-94 between Maple Grove Parkway and the south ramps of the proposed I-94/Brockton Lane interchange to improve traffic flow and safety concerns. The Engineering Firm has been selected for the preliminary design stage which includes the environmental assessment, MN DOT approved layout, and right-of-way basemap. Preliminary design stage will take 15 months to complete. Advancement to schematic design is pending acquisition and approval of additional funding. Construction is targeted to start in 2022 if funding is acquired.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Retaining Walls, Planting.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents