Similar Projects
Street Improvements 2019 Reclamation Phase II
Bidding
$2,700,000 est. value
Waco, TX

2021 Street Preservation Phase 2 - Mac Mix
Bidding
$1,470,000 est. value
Waco, TX 76700

Slurry Seal 2020
Post-Bid
Hewitt, TX 76643

Emberwood, Dogwood, Karnes, Betsy, Margaret, Susan, and Dayton Street Program Roadway and Drainage Improvements Project
Post-Bid
Less than $4,000,000 est. value
Robinson, TX 76706

Southern Region Disaster Recovery Support BPA
Results

North Marable Street Reconstruction
Results
$1,300,000 est. value
West, TX 76691

Playdium Drive Wastewater System Improvements
Bidding
$1,400,000 est. value
West, TX 76691

McLennan County - Speegleville Road Improvements
Results
Less than $14,500,000 est. value
Waco, TX 76701

Texas Aero Apron Sealcoat (Phase II)
Bidding
Waco, TX 76708

Repl BR and Apprs
Results
Less than $681,088 est. value
TX

Street Improvements -2021 Mill and Overlay, Phase 1
Bidding
$1,865,000 est. value
Waco, TX

2020 Street Preservation Micro-Surface and Slurry Seal
Results
Less than $2,600,000 est. value
Waco, TX 76702

2020 Street Preservation Phase 2, Seal Coat
Results
Less than $649,000 est. value
Waco, TX 76700

5th Street Improvements - Street and Utilities Improvements
Results
$9,600,000 est. value
Waco, TX 76700

Paving Work
Results
Waco, TX 76714

Last Updated 10/20/2020 09:06 AM
Project Title

Dutton Avenue Improvements 11th Street to 26th Street

Physical Address View project details and contacts
City, State (County) Waco, TX 76702   (McLennan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This City of Waco Project will consist of Infrastructure and Street Improvements along Dutton Avenue, from 11th Street to 26th Street. Included are 1.) Water and Wastewater Infrastructure Improvements, from 11th Street to 17th Street. 2.) Street Pavement Milling and HMAC Over lay (3"-6"), from 12th Street to 26th Street. 3.) Street Sidewalk, Driveway and Curb & Gutter Removal and Replacement, from 21st Street to 26th Street. Pedestrian Ramp Construction throughout the Project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents