Similar Projects
Williamson Creek - Richmond Tributary Rehabilitation
Infrastructure
Conception
Less than $4,200,000 est. value
Austin, TX

Water Line Improvements Phase 4 - WA2101 - City of Alvin
Infrastructure
Conception
$2,329,400 est. value
Alvin, TX

Install Electrical Generator at the Polytrauma Transitional Rehabilitation Program
Infrastructure, Renovation
Design
$1,000,000 CJ est. value
San Antonio, TX 78229

Mabank Sanitary Sewer Improvements
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Mabank, TX 75147

Water Treatment Plant Expansion Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Pflugerville, TX 78660

Rehabilitation of Pipe Coatings on a Trestle Over Cypress Creek
Infrastructure
Sub-Bidding
$1,200,000 CJ est. value
Houston, TX 77069

Trinity Crossing Phase 6A Utility Improvements
Post-Bid
Mesquite, TX

Pier 10 Redevelopment / Utility Construction
Post-Bid
Galveston, TX

Mt. Enterprise Waterline System Improvements
Results
$870,000 est. value
Mount Enterprise, TX 75681

Water Line Replacement Project
Results
Anahuac, TX 77514

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Sunny Brook South Drainage - City Of Watauga
Alteration
Conception
$7,801,000 est. value
Watauga, TX 76148

2022 Drainage Easement Improvements
Infrastructure
Bidding
$750,000 CJ est. value
Highland Park, TX 75205

Water Production Facilities Rehabilitation
Post-Bid
Pearland, TX

Fairmont Street Water and Sanitary Sewer Replacement Project
Results
$1,138,143 est. value
Longview, TX 75604

Last Updated 07/27/2022 01:33 AM
Project Title

Phase 1B - Segment D Pipeline

Physical Address View project details and contacts
City, State (County) Lockhart, TX   (Caldwell County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Goal: HUB(11%), Installation of approximatley 95,000 LF of 42" diameter water pipeline, 10 LF of 36" diameter water pipeline, 200 LF of 24" diameter water pipeline,250 LF of 16" diameter water pipeline and 10 LF of 12" diameter water pipeline installed by open-cut and trenchless methods in Guadalupe and Caldwell Counties.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents