Similar Projects
RFQ Contractor - Hernandez-West Park-ICR
Renovation
Bidding
$1,500,000 CJ est. value
Chicago, IL 60632

CTA - Lake Line - Austin Station
Infrastructure, Renovation
Bidding
$900,000 CJ est. value
Chicago, IL 60644

Concrete Slab Raising
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Orland Park, IL 60462

UIC Dumpster Pads
Renovation, Alteration
Post-Bid
Chicago, IL 60607

Weir Concrete Repairs
Alteration
Post-Bid
IL

Pin & Link Assembly Expansion Joint Retrofits 4
Alteration
Results
Chicago, IL

2022 Concrete Improvements
Infrastructure, Alteration
Results
Des Plaines, Park Ridge, IL 60068

Main Drain Replacement & Concrete Repair
Infrastructure, Alteration
Post-Bid
Oak Park, IL 60304

Seascape Pool Concrete Repairs
Alteration
Results
Hoffman Estates, IL

Concrete Work at Various Locations
Term Contract
Post-Bid
Chicago, IL

2022 Exterior Concrete Restoration
Alteration
Results
Arlington Heights, IL

Concrete Work at Bus Turnarounds
Term Contract
Post-Bid
$500,000 est. value
Chicago, IL

2022 Concrete Improvement Program
Alteration
Results
Schaumburg, IL

Concrete Replacement Program
Alteration
Post-Bid
Morton Grove, IL

2022 Concrete Replacement Program
Alteration
Results
Bartlett, IL

Last Updated 04/06/2023 07:05 PM
Project Title

2023 Alley Improvements

Physical Address View project details and contacts
City, State (County) Forest Park, IL 60130   (Cook County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $436,053 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This improvement is located on the 900 Block Alley Dunlop-Lathrop, 1100 Block Alley Cirlce-Marengo, in the Village of Forest Park, Cook County, Illinois. The proposed work on the alley includes Portland Cement Concrete Pavement, subbase granular material, storm sewer and drainage structures, driveway removal and replacement, curb and gutter removal and replacement, and PCC sidewalk. Site Directions: I290 to Des Plaines Avenue in Forest Park. See location map on plans.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents