Similar Projects
Mission Rock - Masterplan
New Construction - 1,315,489 SF
Conception
San Francisco, CA 94137

Slauson and Wall Development
New Construction - 60,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Los Angeles, CA 90011

Warner Center Life Plan Community - Woodland Hills
New Construction - 758,835 SF
Design
$10,000,000 CJ est. value
Los Angeles, CA 91367

Icon/Echo Towers
New Construction, Demolition - 478,500 SF
Design
$600,000,000 est. value
San Jose, CA 95113

Install JPCP(RSC), LCB Rapid Setting, Class 3 AB, Slab Replacement
Infrastructure
Bidding
$120,000,000 est. value
Palmdale, CA 93550

CIDH Piles, Excavation, Rock Slope Protection, and Bridge Removal
Infrastructure
Bidding
$8,800,000 est. value
Santa Rosa, CA

Park: All Inclusive Playground - Emma Prusch
New Construction
Post-Bid
$2,250,001 to $2,750,000 est. value
San Jose, CA

Ramona Playground & Room Alterations at Sanchez
Renovation
Post-Bid
Norwalk, CA 90650

Tahoe Park Pool Restroom Renovation
Renovation, Infrastructure
Results
$220,570 est. value
Sacramento, CA 95820

Creekside and Meadowbrook Group Area Renovation at Vasona Lake County Park
Renovation
Results
$924,206 est. value
Los Gatos, CA 95032

SCS Dublin Mixed-Use Development
New Construction - 265,000 SF
Pending Verification
$10,000,000 est. value
Dublin, CA 94568

Cambrian Park Plaza Shopping Center
New Construction, Demolition - 184,060 SF
Conception
$10,000,000 CJ est. value
San Jose, CA 95124

Primrose Preschool
New Construction - 20,986 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Walnut Creek, CA 94598

Prequalification for JOC Contractors
Renovation
Bidding
San Jose, CA

American River Common Features 2016 Erosion Protection Project
Term Contract
Post-Bid
Sacramento, CA 95814

Last Updated 06/06/2022 06:54 AM
Project Title

Civil - Andree Clark Bird Refuge Coastal Restoration Project

Physical Address View project details and contacts
City, State (County) Santa Barbara, CA   (Santa Barbara County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is located at the Andree Clark Bird Refuge and the Municipal Tennis Courts in Santa Barbara and will replace the Bird Refuge lagoon weir and weir gate, remove non-native trees, re-contour the lagoon on the beach side, install native trees and rock cluster. It will also include landscaping improvements and construction of a bio-retention pond at the Municipal Tennis Center property.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents