Similar Projects
Palmer Court Parking Lot and Security Doors
Infrastructure, Alteration
Bidding
Salt Lake City, UT 84111

Mill and Overlay 2022
Infrastructure
Bidding
Murray, UT

SLC Airport PCC Pavement Joint Seal Program - Deicing Pad Taxiway
Post-Bid
Salt Lake City, UT

650 S Construction Trax Platform
Post-Bid
$1,750,000 to $2,000,000 est. value
Salt Lake City, UT

2021 High Density Mineral Bond
Results
South Jordan, UT 84095

City Wide Crack Seal - Project
Results
Cottonwood Heights, UT 84121

Zone 6 Highway Junction Reservoir 2
Infrastructure
Bidding
$4,700,000 to $5,100,000 est. value
West Jordan, UT 84088

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

Northwest Avenue Sidewalk,5415 So to 5570 So Pedestrian/Bike Facility
Results
Less than $500,000 est. value
UT

SR-266; I-15 To 700 E
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
UT

City-Wide Roadway Improvement Project
Infrastructure
Post-Bid
Cottonwood Heights, UT

1500 South Reconstruction From Redwood Road To 2700 West
Results
Salt Lake City, UT

DFCM Construction - Pre-Qualified Paving - SLCC Phase 2 Pavement Maintenance
Infrastructure
Bidding
$800,000 est. value
Salt Lake City, Sandy, West Jordan, UT 84088

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

SR-190, I-215 to SR-210
Results
$500,000 to $1,500,000 est. value
UT

Last Updated 03/21/2022 11:08 AM
Project Title

Orange Street Bus Facility

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84129   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,381,620
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances indicated in the Contract Documents. The Work generally includes but is not limited to curb and gutter, concrete flatwork and asphalt paving, pre-fabricated building, and electrical work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents