Similar Projects
Alcester WWTF Improvements
Renovation, Infrastructure
Bidding
$4,917,634 CJ est. value
Alcester, SD 57001

Wastewater Treatment Improvements
Renovation
Post-Bid
Fort Pierre, SD

Dayton WWTP Improvements
Renovation
Post-Bid

Aberdeen WRF Biosolids Dewatering
Renovation
Results
Aberdeen, SD

2021 Hot Springs Wastewater Treatment Facility Digester Cover Replacement
Results
Hot Springs, SD

WRF Aeration Basin Clariflocculator and Siphon Piping
Renovation
Post-Bid
Rapid City, SD

Wastewater Treatment Facility Primary Clarifier No - 2
Renovation
Results
$2,300,000 est. value
Watertown, SD

Water Treatment Plant
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Springfield, SD 57062

WWTF Improvements - Phase 1B Building Modifications
Renovation
Results
$770,000 est. value
Custer, SD

Intake Improvements Lower Brule Rural Water System
Renovation, Infrastructure
Post-Bid
$1,129,730 CJ est. value
Lower Brule, SD 57548

Wastewater Treatment Plant Headworks Improvements
Renovation
Results
$1,500,000 est. value
Mobridge, SD

Wastewater Treatment Facility Headworks Improvements
New Construction
Results
Mitchell, SD 57301

Brandon WTP Expansion
Renovation
Results
$2,000,000 est. value
Brandon, SD

Vermillion UV Improvements - 2022
Addition
Results
$450,000 to $475,000 est. value
SD

Furnishing Granular Materials For Phase 2 & 3 WWTF Improvements Project - Rebid
Renovation, Infrastructure
Results
$229,790 CJ est. value
Custer, SD 57730

Last Updated 10/05/2022 12:33 PM
Project Title

WRF Aeration Basin Clariflocculator Project

Physical Address View project details and contacts
City, State (County) Rapid City, SD 57701   (Pennington County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All proposals shall be made on the forms furnished by the City. The City reserves the right to reject any or all bids or to waive all informalities and to accept the bid that is to the advantage of and is in the best interest of the City of Rapid City. Davis Bacon and Related Acts wages and American Iron and Steel Provisions apply to this project. All provision relative to those acts must be met. Build America, Buy America provisions of the Infrastructure Investment and Jobs Act (IIJA) and E.O. 14005 also apply to this project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents