Similar Projects
Replace Roof Building 1
Alteration
Design
$500,000 to $1,000,000 est. value
Wilkes-Barre, PA 18702

Roofing Replacment at Lincoln Heights
Alteration
Bidding
$400,000 est. value
Pittston, PA 18640

Glen Lyon Roof Replacement Projects
Post-Bid
Glen Lyon, PA 18617

2021 Roof Project
Alteration
Post-Bid
Wilkes Barre, PA 18702

Roof Replacement Work
Results
Plymouth, PA 18651

Replacement of an Existing Skylight in the Technology Center at the Main Campus
Results
Nanticoke, PA 18634

Roof Replacement Work at Winter Street
Alteration
Post-Bid
Pittston, PA 18640

Re-Roofing of Main Pump House Roof and Pump Station #1, #10 and #16
Results
Exeter, Nanticoke, Wilkes-Barre, PA 18643

2022 New Municipal Roof Project Contract
Alteration
Post-Bid
$400,000 est. value
Wilkes Barre, PA

Roofing Replacement Project at Boulevard Townhomes
Results
Wilkes-Barre, PA

Exterior Facade Improvements and Roofing Replacement - WVSA Facility
Alteration
Post-Bid
$400,000 est. value
Wilkes-Barre, PA 18706

Roof Replacement
Alteration
Results
Nanticoke, PA 18634

Building Roof Replacements at Seven (7) LNA Service Stations Located in NJ, NY & PA
Alteration
Post-Bid

Leo E. Solomon Elementary School Roof Replacement Project
Alteration
Results
Wilkes Barre, Wilkes-Barre, PA 18705

Roof Replacement of the General Municipal Authority of Harveys Lake Administration Building
Alteration
Results
$25,000 est. value
Harveys Lake, PA 18618

Last Updated 07/12/2022 07:24 AM
Project Title

Replace Roof Building #27

Physical Address View project details and contacts
City, State (County) Wilkes-Barre, PA 18702   (Luzerne County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DVBE 100% This project consists of replacing approximately 20,000 square feet of roofing on Building 27 at the Wilkes-Barre VA Medical Center Work Includes a. Provide all labor, equipment and materials to install the new roof system over the prepared substrate. b. Contractor shall supply Safety plan. c. Contractor shall comply with ICRA, keeping the interior area clean from there entre on the roof to the loading dock area. d. Contractor shall supply a shop drawing of the roofing system to show water flow. e. Remove the existing roofing smooth BUR w/coating system roof down to existing concrete/medal decking. Only as much roofing will be removed as can be replaced in the same day. The removal of all debris from the roof and the ground, daily. f. Remove all obsolete vents, units and penetrations from the roof area and repair accordingly. (As needed) g. Repair all areas of concrete/metal decking that require patching. h. Install a 60-mil 0.35(1.71) Ethylene Propylene Diene Terpolymer (EPDM) Membrane. Shall sustain 90MPH winds. Submit specific materials for a 90mph VERSIGARD Roofing Product, roofing system. The roofing shall be installed by a Certified VERSIGARD Installer. i. Installer specified products with satisfactory service on five similar installations for a minimum five years. Project experience list shall provide contacts names and addresses for completed projects. j. Fabricate and install new pressure treated wood blocking and aluminum gravel stop at roof perimeter. (As needed) k. Cut into existing reglet at the rising walls where applicable. Fabricate and install new copper counter flashing. l. Roof shall have positive drainage to roof drains. There shall be no standing water. Roof Crickets shall be constructed to divert water away from the from penthouses to the roof drains. m. Roofing contractor shall conduct flood test by plugging the drains and fill the roof with water. To check for leaks. n. Replace all (18) roof drains. Size of new drains to match existing. This is a full replacement of the drains. The drain shall be completely removed to the closet coupling beneath the roof. The drain shall be clamped to the concrete/metal decking. o. Fabricate new copper or lead flashings to all pitch pockets and fill with pourable sealer. p. Fabricate new lead flashings to all vent/heat stacks and overflow scuppers. All piping shall be extended at least 14" past the roof the finish roof. all piping material shall be metal, same size as existing piping. (no PVC piping) q. All items moved or disturbed during construction will be returned to the original location/condition. r. Provide all construction layouts and details for VAMC review and approval. s. Remove all job-related debris from the premises daily. t. Lightning protect will be updated to newest code's and recertified. u. Roof shall have a twenty-year Manufacturer's NDL (no dollar Limit) warranty to be provided by roof manufacturer. The Twenty-year warranty shall be the whole TOTAL SYSTEM WARRANT, that shall consist of roofing materials, flashing, all other metal components and Labor for all work. v. They shall be a safety rail installed on the top of the exterior and interior parapet wall. The total height shall be no less than 42" with the combination parapet wall and safety rail. (Approximately 1000ft, contractor verify length) w. They shall install 2 rows of Bird Spikes to the top of the parapet walls they shall be fastened down to the top and shall with-stand 90mph winds. (Approximately 2000ft, contractor verify length) x. All metal caps and all other metal components shall be able to withstand 90mph winds. Worksite is located on the second and eight floor of the Wilkes-Barre VAMC, 1111 East End Boulevard, Wilkes-Barre, PA 18711.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents