Similar Projects
MOTSU-22018 Annual Roof Repairs
Alteration
Design
$1,000,000 to $5,000,000 est. value
Southport, NC

Gym Roof Replacement
Alteration
Bidding
Oak Ridge, NC 27310

Morehead and Oakview Recreation Centers Roof Replacement
Alteration
Bidding
$200,000 est. value
High Point, NC 27260

Replace Roof and HVAC, MCCS Whistle Stop B1691
Post-Bid
$250,000 to $500,000 est. value
Cherry Point, NC

Partial Roof Replacement Ligon Middle School Areas
Post-Bid
$500,000 to $600,000 est. value
Raleigh, NC 27601

Re-Roofing of the Margaret Hearne Elementary School
Results
Wilson, NC 27893

Replacement of Roofs Northwoods Park Middle School
Results
Jacksonville, NC 28540

Roofing Project
Alteration
Bidding
Laurinburg, NC

Roofing (Metal)
Post-Bid
Robersonville, NC

Roof Replacement East Union Middle School Roofs 2.01 and 2.02
Results
Less than $100,000 est. value
Marshville, NC 28103

Little River Roof Replacement Project
Alteration
Bidding
$150,000 est. value
Durham, NC 27712

Gutters and Downspouts
Post-Bid
Robersonville, NC 27871

B129 Replace Roof and Apply Masonry Sealer
Results
$500,000 to $1,000,000 est. value
Cherry Point, NC 28533

Modernization of Project Nc 95-1
Alteration
Bidding
Forest City, NC 28043

Metal Carport
Post-Bid
Morganton, NC

Reported 04/27/2022 12:00 AM
Project Title

Roofing Project

Physical Address View project details and contacts
City, State (County) Carthage, NC 28327   (Moore County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $35,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For a roofing project at the Moore County Department of Social Services facility. Between these two buildings there is approximately 41,000 sq. ft Install new flute filler insulation over existing metal roof Attach one layer of 1.5'' polyisocyanurate insulation over flute filler Option A mechanically attach one layer of 50 mill Fibertite xt membrane over insulation Option B mechanically attach one layer of 60 mill TPO membrane over insulation Install wood nailer at the edge Install flashing where needed Install new prefinished 24ga galv. Steel coping Provide a manufacturer's 20 year warranty Potect all HVAC units, sidewalks, pavement and any other items from being damaged during construction. Install new 30 by 36 roof hatch. There is currently not one Every day ensure the work site is left clean. Install roof pad walkway around the HVAC units The gutters and metal wall panels will remain and will not be replaced. Everything that it will take to complete this project from start to finish is up the roofing vendor that is awarded the job.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents