Similar Projects
Design-Bid-Build Services - Electric Bus Charging Infrastructure
New Construction
Post-Bid
SC 29405

Design Assist Subcontractor Services for Gateway Enhancement
New Construction
Results
North Charleston, SC 29418

Southern Carolina Landing Pad
Post-Bid
Beaufort, SC 29901

Installation of Bus Stop Signs and 1 Bus Shelter
Alteration
Results
$40,000 to $50,000 est. value
Elgin, Kershaw, SC

Installation of Bus Stop Signs and 1 Bus Shelter
Alteration
Results
$40,000 to $50,000 est. value
Elgin, Kershaw, SC

Installation of Bus Stop Signs and 1 Bus Shelter
Alteration
Results
$40,000 to $50,000 est. value
Elgin, Kershaw, SC

CML Play Pavillion
New Construction - 4,800 SF
Design
Charleston, SC 29403

Bus Stop Construction And Installations - Phase 1
New Construction
Results
Greenville, SC

Gateway Enhancement
Renovation
Results
SC

Bus Stop Shelters and Other Amenities
Results
Greenville, SC 29602

CAE Checked Baggage Inspection System and Ticketing Improvements
Renovation - 20,000 SF
Results
Columbia, SC 29228

Last Updated 09/23/2021 07:21 AM
Project Title

Rental Car Canopies (Construction) at Myrtle Beach International Airport (MYR)

Physical Address View project details and contacts
City, State (County) Myrtle Beach, SC 29577   (Horry County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work may generally be described as the installation of canopies covering approximately 660 parking spaces in the Rental Car Parking Lot at Myrtle Beach International Airport. The work includes a base bid and Option No. 1. The base bid includes all work required to construct Canopies 1A, 1B, 1C, 1D, 1E, 1F, 1G, 1H and 1I including associated site work, storm drainage, landscape architecture, electrical and security work as indicated on the project drawings and project manual. Option No. 1 includes all work required to construct Canopies 2A, 2B, 2C, 2D, 2E, 2F, 2G, and 2H including associated site work, storm drainage, landscape architecture, electrical and security work as indicated on the project drawings and project manual.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents