Similar Projects
Elevator and Wheelchair Lift Maintenance
Alteration
Bidding
Buffalo, NY

Frontier CSD Capital Outlay Project - Pinehurst Elementary School
Post-Bid
Lake View, NY

Z1da--Elevator Maintenance Service Agreement
Term Contract
Post-Bid
Buffalo, NY 14215

Buffalo Museum of Science Elevator Improvement
Results
Buffalo, NY 14211

Elevator and Escalator Maintenance - Library
Term Contract
Results
Buffalo, NY 14201

Interior Signage for Buckham Hall at Buffalo State College
Alteration
Post-Bid
Buffalo, NY 14222

Clemens Hall - Stair Tower Improvements at SUNY Buffalo
Results
Buffalo, NY

Removal of Audiology Sound Booths in Building 16
Demolition
Post-Bid
Less than $50,000 est. value
Buffalo, NY 14224

Capital Outlay Project 20/21
Results
Depew, NY 14043

Corridor Ceiling and Lighting Abatement and Rehab - Cleveland Hall
Alteration
Post-Bid
Buffalo, NY 14222

Cheektowaga Sloan UFSD Capital Outlay Project 2020-2021
Results
Less than $75,000 est. value
Cheektowaga, NY 14227

Maintenance Service Contract for Elevators and Escalators
Term Contract
Post-Bid
Buffalo, NY 14203

Exterior Elevator Replacement, Group 975
Alteration
Results
Buffalo, NY 14202

Elevator Maintenance
Alteration
Post-Bid
East Amherst, NY

Cleveland Hill UFSD Capital Outlay Project 2021-2022
Alteration
Results
Cheektowaga, NY 14225

Last Updated 06/13/2022 01:19 AM
Project Title

LRRT - University Station Escalator Tube Panel Liner Replacement

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14214   (Erie County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

LRRT – University Station Escalator Tube Panel Liner Replacement. NFTA Project No 15LS2004. The scope of work includes the following: removal of existing porcelain enameled metal wall/ceiling panels and their associated attachment framing and hardware; fabrication of light gauge stud walls for the installation of porcelain wall tile as well as the installation of reinforced plastic panels on existing and new framing members as well as the installation of architectural lighting and speakers; removal, rework and reinstallation electrical wiring and conduit, radio transmission wiring/antenna’s fire/smoke alarms and other incidental device; some removal and installation work will be performed on scaffolding which will span over the stairs and at least one escalator at a time. Note that base bid requires that at all times the center stairs, and a path of egress, must remain fully accessible as well as one operational escalator. Proper head clearance of a minimum of 8’-0” must be maintained between floor (escalator and/or stairs) at all times. Refer to specification section 01 4250 – Scaffolding, Staging, Safety Standards and Work Restrictions for further information regarding scaffolding for this project. Temporary lighting to be provided and maintained at all times.

Details

Division 09 - Finishes, Ceilings.
Division 14 - Conveying Equipment, Operation and Maintenance of Conveying Equipment, Operation and Maintenance of Escalators and Moving Walks, Escalators, Scaffolding.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Fire Detection and Alarm, Smoke Detection Sensors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents