Similar Projects
Last Updated | 12/06/2018 11:56 AM |
Project Title | F--Point of Generation Waste Sampling |
Physical Address | View project details and contacts |
City, State (County) | Mayport, FL 32228 (Duval County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor is to follow the FDEP Laboratory Standard Operating Procedures (SOP) found at 62-160 Florida Administrative Code (FAC) and the Navy Environmental Compliance Sampling and Field Testing Procedures Manual (NAVSEA T0300-AZ-PRO-010) for all work (sampling and analysis) performed for NAVSTA Mayport. The laboratory project manager and sampler will review the Part B HWSF Waste Analysis Plan (WAP) at the time of contract award and maintain a copy to reference during sampling. The Contractor shall provide technically trained and competent sampler(s) to collect samples from a variety of work centers and sites. The sampler will have received initial sampling training and receive routine refresher training. The contractor will provide documentation of sampler training at the start of the contract and annually thereafter. Sampling at NAVSTA Mayport may require samples be taken from roll-offs, drums, buckets, tanks, and other containers or locations on-base other than the Part B HSWF as identified by the government at least 24-hours in advance. In accordance with the State of Florida and USEPA regulations and the installations permit, all samples will be documented on a chain of custody form and in field notes that document the existing conditions, noting any abnormalities with material or waste being sampled. Field note documentation will include at a minimum: Date, time, and location of sampling, weather conditions including temperature in degrees Fahrenheit, wind direction (if sampling outside), rain fall data, cloud cover/sky conditions, and description of sample including color, odor, and texture. Additionally, field notes will include a sketch of where samples were taken (when collecting composite or soil samples), and note the specific drum(s) sampled. A copy of these field notes will be provided as an attachment to the final analysis report. Contractor will ensure each container sampled is marked or labeled to indicate date and time of sampling, the name of the sampler and sample ID (which will be a unique identification number which identifies the specific container). Contractor will make available daily calibration and annual calibration logs on all required sampling equipment upon government request. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |