Similar Projects
IH0035 - Asphalt
Infrastructure
Bidding
$168,000 est. value
TX

2021 Street Maintenance Program - High Density Mineral Bond
Infrastructure
Bidding
Round Rock, TX

El Malino Dr. and Bellemeade Blvd. Pavement Rehabilitation
Post-Bid
Less than $318,249 est. value
Pflugerville, TX 78660

Caughfield Phase Ten Paving, Drainage, Water Wastewater Improvements
Post-Bid
Austin, TX 78728

Southern Region Disaster Recovery Support BPA
Results

Miscellaneous Streets Slurry Seal and Fog Seal IDIQ(CIP )
Term Contract
Results
$8,000,000 est. value
Austin, TX

Lazy Nine MUD No - 1A Madrone Canyon
Infrastructure
Bidding
Austin, TX

Estates at North-Gate Phase 1
Post-Bid
Austin, TX 78728

Sun Chase South Sections 6 and 7 - Streets, Drainage, Water, Wastewater and Erosion Control Improvements
Results
Austin, TX 73301

Park Side on the River Phase 1A
Post-Bid
Austin, TX

Performance Based Contract
Results
Less than $27,469,730 est. value
TX

Bryson Phase 2, Section 3, Public Improvement Construction Plans Water, Wastewater, Drainage and Paving Improvements
Post-Bid
Leander, TX 78641

System-Wide Performance Based Maintenance Contract
Term Contract
Results
Less than $51,426,072 est. value
Austin, TX 78705

Balcones Asphalt Paving
Post-Bid
$35,000 to $45,000 est. value

Miscellaneous Streets Maintenance Overlay IDIQ Project(CIP)
Term Contract
Results
$24,000,000 est. value
Austin, TX 78704

Last Updated 06/14/2021 10:50 AM
Project Title

Independent Environmental Compliance Management Services for 183 North Mobility Project

Physical Address View project details and contacts
City, State (County) Austin, TX 78750   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,780,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project encompasses a nine-mile stretch of U.S. 183 between State Highway 45 North and MoPac and includes construction of two express lanes in each direction and the addition of a general-purpose lane to bring the number of non-tolled lanes to four in each direction. Express lane direct connectors and a collector-distributor road will be constructed with MoPac to the south to provide operational improvements. The project also includes new shared use path connections, new sidewalks, and cross-street connections for bicycles/pedestrians.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents