Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Controlled Humidity Protection System Services
Results
Avon Park, Bradenton, Fort Myers, Palmetto, Saint Petersburg, West Palm Beach, FL

Terminal HVAC Improvements
Results
Sebring, FL 33870

Replacement AC Equipment
Post-Bid
FL

Rooftop Unit (RTU) Replacement
Results

AC Equipment Upgrade Sun `N Lakes, Cracker Trail & Lake Country Elementary
Post-Bid
Lake Placid, Sebring, FL 33875

Lake Placid Middle Replacement Chillers
Results
Lake Placid, FL 33852

Sebring and Avon Park Middle School Gymnasium A/C
Post-Bid
Avon Park, Sebring, FL 33870

Ductwork Replacement at Avon Park Middle
Results
Avon Park, FL 33825

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Equipment Maintenance, Repair, Installation, and Replace Services-Various Locations North Region
Alteration
Results

Chilled Water Air Handler Pre-Purchase Package for Lake Placid MS
Alteration
Post-Bid
Lake Placid, FL 33852

Split DX Pre-Purchase Package for Cracker Trail ES, Park ES, Lake Country ES and Sun 'N Lakes ES
Alteration
Post-Bid
Avon Park, Lake Placid, Sebring, FL 33825

Chilled Water Air Handler and VAV Air Terminals Pre-Purchase Package for Lake Placid Elementary School
Alteration
Post-Bid
Lake Placid, FL 33852

Reported 12/15/2021 12:00 AM
Project Title

Terminal HVAC Relocation and Improvements

Physical Address View project details and contacts
City, State (County) Sebring, FL   (Highlands County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Relocation of 2 – 25 Ton Carrier Condensing Units. Relocate Electrical power connection for the 2 – 25 ton condensing units. Replacement of Refrigeration Tubing for 4 cooling circuits between relocated condensing units and two existing air handling units. Diagnosing faults with the controls of both relocated condensing units and replacing any parts required to correct the operation of the unit. Diagnosing faults in the controls of two 8000 CFM Carrier constant volume air handling units and replacing any parts required to correct the operation of the unit. Diagnosing faults in a 15-ton Carrier condensing unit and replacing any parts required to correct the operation of the unit. Diagnosing faults in the controls of one 6000 CFM Carrier constant volume air handling units and replacing any parts required to correct the operation of the unit. Diagnosing communication faults between air handling units and condensing units for two 25-ton Carrier dual circuit constant volume and one 15-ton Carrier constant volume systems. Setting the sequence of operation for two 25-ton systems and one 15-ton system

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents