Similar Projects
Last Updated | 11/30/2022 04:34 PM |
Project Title | Yuba College Campus Multiple Buildings, Ceiling Repairs |
Physical Address | View project details and contacts |
City, State (County) | Yuba City, CA 95991 (Sutter County) |
Category(s) | Single Trades |
Sub-Category(s) | Finishes/Exterior |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The District consists of two colleges, Woodland Community College and Yuba College, with campuses located at six different locations: Yuba College in Marysville, CA; Sutter County Center in Yuba City, CA; Beale Education Center, Beale AFB, CA; Woodland Community College in Woodland, CA; Colusa County Center in Williams, CA; and Lake County Campus in Clearlake, CA. The Yuba Community College District seeks proposals from qualified Licensed Contractors to make ceiling repairs in several buildings at the Yuba College campus. Yuba College Campus Address: 2088 North Beale Road, Yuba City, California 95901 The Yuba Community College District is accepting proposals for Multiple Buildings, Ceiling Repairs Project. There are also some wall repairs in the scope of work. This work is not part of the Fire Alarm Systems project. This work will be a separate project. Although the Fire Alarm Systems work is shown on the drawings as a reference, it is not part of the scope of work of this project. Only ceiling and wall surface repairs are part of the scope of work of this project. There may be a few new locations not shown on the drawings which will be covered in the contingency line item in the Bid form in Appendix A. Approximate Award Date: October 19, 2022 100% Completion Date: December 8, 2022 Single Point of Contact during the Proposal Preparation Process: David L. Willis District Director of Maintenance, Operations, and Planning 425 Plumas Blvd., Suite 200 (Second Floor) Yuba City, California, 95991 Cell Phone: 916-747-4262 Email: dwillis@yccd.edu On-site coordination, first contact person access and immediate contact person during construction. Bryan Epp Assistant Director of Maintenance, Operations 2088 North Beale Road Phone: 530-740-1722 Email: bepp@yccd.edu |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |