Similar Projects
P405 Design-Bid-Build, Range Improvements & Modernization, Phase 3, Marine Corps Recruit Depot, Parris Island, South Carolina
Design
$2,500,000 to $100,000,000 est. value
Parris Island, SC

Detention Center Outdoor Recreation Cover
Renovation
Bidding
Barnwell, SC

Camden-Ancillary Site Facilities For Splashpad
Post-Bid
Camden, SC

Surfside Beach Fishing Pier Reconstruction Project
Post-Bid
Less than $13,400,000 est. value
Surfside Beach, SC 29575

Lake Hartwell Camper Cabin Construction
Results
$200,000 to $275,000 est. value
Fair Play, SC 29643

Windjammer Park Pavilion
Results
Tega Cay, SC 29708

St. Andrew By-The-Sea United Methodist Church Campus
New Construction
Construction
$755,000 est. value
Bluffton, SC 29910

Sunset Pavilion
New Construction - 2,150 SF
Construction
$335,822 est. value
Hilton Head Island, SC 29928

Creative Arts City Park
Post-Bid
North Charleston, SC

Cannon Park Picnic Shelter Refurbishment
Results
Central, SC 29630

Landrum Farmers Market Pavilion
New Construction - 8,006 SF
Construction
Landrum, SC

Community Pavilion Project
New Construction
Post-Bid
Less than $135,000 est. value
Chester, SC 29706

Picnic Shelters
Results
York, SC 29745

Restroom Renovations at Park West
Renovation
Post-Bid
Mount Pleasant, SC 29466

Optimum Maintenance And Repair Services To The Athletic Fields
Results
Orangeburg, SC

Reported 08/31/2021 12:00 AM
Project Title

Brewer Community Center Restroom Renovations

Physical Address View project details and contacts
City, State (County) Greenwood, SC 29646   (Greenwood County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work at Brewer Recreation Center in Front men’s restroom and the back men’s and ladies restroom. Replace 3 sinks, install new hot water line. (Already teed off in ceiling) 1. Faucet style- One handle (Z86100XL) with Sloan (3326009 mix 60). 2. 3 new Flush Valves- Zurn 6000-WS1-YB-YC s, one toilet that is ADA compliant, two standard sizes toilets. 3. Remove 4 urinals – leaving the middle urinals on each side. 4. Remove partition wall between each of the toilets; patch the floor under partition with new tile. 5. Tile Work a. Patch floor and replace tile under old urinals. b. Patch floor from removing 3rd toilet, replace tile. c. New tile on wall and floor from removing walls between toilets. 6. Add a 2 by 2ft drop ceiling over the entire restroom, new LED lights, and run new vent for heat/ac. Close off heat/ac return. 7. Install new solid plastic partitions and doors for 3 toilets.

Details

Misc. Recreational, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents