Similar Projects
Reported | 08/31/2021 12:00 AM |
Project Title | Brewer Community Center Restroom Renovations |
Physical Address | View project details and contacts |
City, State (County) | Greenwood, SC 29646 (Greenwood County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Misc. Recreational |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work at Brewer Recreation Center in Front men’s restroom and the back men’s and ladies restroom. Replace 3 sinks, install new hot water line. (Already teed off in ceiling) 1. Faucet style- One handle (Z86100XL) with Sloan (3326009 mix 60). 2. 3 new Flush Valves- Zurn 6000-WS1-YB-YC s, one toilet that is ADA compliant, two standard sizes toilets. 3. Remove 4 urinals – leaving the middle urinals on each side. 4. Remove partition wall between each of the toilets; patch the floor under partition with new tile. 5. Tile Work a. Patch floor and replace tile under old urinals. b. Patch floor from removing 3rd toilet, replace tile. c. New tile on wall and floor from removing walls between toilets. 6. Add a 2 by 2ft drop ceiling over the entire restroom, new LED lights, and run new vent for heat/ac. Close off heat/ac return. 7. Install new solid plastic partitions and doors for 3 toilets. |
||||||||||||||||
Details | Misc. Recreational, Renovation.
|
||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |