Similar Projects
Draft: Repair Roof and HVAC System at Main CDC Bldg. 2530
Term Contract
Design
San Antonio, TX

Roof Replacement
Renovation - 81,000 SF
Design
$600,000 CJ est. value
Brookesmith, TX 76827

Phase One - Re-Roofing Project
Build-out
Sub-Bidding
$100,000 CJ est. value
Bronte, TX 76933

ARPA Funded Roof Sealant for Police and Fire Training Academy and City Hall
Renovation
Sub-Bidding
$130,000 CJ est. value
Irving, TX 75062

Balch Springs Recreation Center Roof Replacement
Post-Bid
Balch Springs, TX 75180

Waxahachie Readiness Center Roof Replacement
Alteration
Post-Bid
$540,000 est. value
Waxahachie, TX

Roof Replacement at Lufkin State Supported Living Center
Results
$430,000 est. value
Pollok, TX 75969

New Braunfels Area Office Roof Replacement
Results
$87,931 est. value
New Braunfels, TX 78130

Su Clinica Reroofing Project - Phase 2
Renovation
Construction
Harlingen, TX 78550

Partial Reroof of Richardson HS and MST 2023
Renovation
Sub-Bidding
$200,000 CJ est. value
Richardson, TX 75081

BSE Roof Repair and Related Work
Alteration
Post-Bid
San Antonio, TX

Building 1788 Roof Replacement
Results
$553,414 est. value
San Antonio, TX 78226

2022 Hail Damage Roof Repair and Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Medina, TX 78055

Sports Park Complex Reroof
Alteration
Post-Bid
Brownsville, TX 78526

Roof Replacement at Irving ISD Administration Building
Results
$850,000 to $1,000,000 est. value
Irving, TX 75062

Last Updated 02/22/2023 02:56 PM
Project Title

Roof Replacement Buildings A, C, and D - Bryan Campus

Physical Address View project details and contacts
City, State (County) Bryan, TX 77802   (Brazos County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Blinn College District invites qualified firms to submit Competitive Sealed Proposals for: Bryan Campus Roof Replacement Bldgs. A, C & D. Time/date stamp clock in the Purchasing Department shall be the official time of receipt. Responses received in the Purchasing Department after submission deadline shall be returned unopened and will be considered void and unacceptable. Mailing of a Proposal does not ensure that the RFP will be delivered on time or delivered at all. The proposer (not the college mail system) is solely responsible for ensuring the RFP is received prior to the closing date and time. Delivery at any other campus location or any other department is unacceptable. Blinn College District reserves the right to reject any and/or all RFP's, to award contracts as may appear advantageous to the Blinn College District, and to waive all formalities in offering Base Bid: This project on the Bryan Campus of Blinn College includes roof replacements and will address the following areas: a. Building A 1) Remove and properly dispose of existing surfacing (gravel); roof membrane and flashings; insulation board; etc. to prepare for the installation of a new roof membrane system. 2) Repair/replace any damaged/deteriorated steel roof deck. 3) Install two layers of 2.2" flat-stock polyisocyanurate insulation board; loose-laid over existing steel deck. 4) Install 1/2 " recovery board (4'x4' boards) over flat-stock polyisocyanurate insulation; mechanically fastened to existing steel deck. 5) Install 60-mil. TPO single-ply membrane; fully adhered with approved adhesive. 6) Install TPO single-ply flashing membrane utilizing approved adhesives and heat welding at membrane laps. 7) Install new TPO-coated metal pitch pans, where necessary. 8) Install new pre-finished sheet metal counter-flashings, penetration flashings, and other sheet metal components. 9) Install new pre-manufactured equipment supports, where indicated on drawings. 10) Install new TPO single-ply membrane walkway pads, where indicated on drawings. 11) Provide new sheet metal splash blocks at all downspouts. 12) Remove corrosion from, properly prepare and apply new paint to all roof-top appurtenances. b. Building C 1) Remove and properly dispose of existing surfacing (gravel); roof membrane and flashings; insulation board; etc. to prepare for the installation of a new roof membrane system. 2) Repair/replace any damaged/deteriorated steel roof deck. 3) Install two layers of 2.2" flat-stock polyisocyanurate insulation board; loose-laid over existing steel deck. 4) Install 1/2 " recovery board (4'x4' boards) over flat-stock polyisocyanurate insulation; mechanically fastened to existing steel deck. 5) Install 60-mil. TPO single-ply membrane; fully adhered with approved adhesive. 6) Install TPO single-ply flashing membrane utilizing approved adhesives and heat welding at membrane laps. 7) Install new TPO-coated metal pitch pans, where necessary. 8) Install new pre-finished sheet metal counter-flashings, penetration flashings, and other sheet metal components. 9) Install new pre-manufactured equipment supports, where indicated on drawings. 10) Install new TPO single-ply membrane walkway pads, where indicated on drawings. 11) Provide new sheet metal splash blocks at all downspouts. 12) Remove corrosion from, properly prepare and apply new paint to all roof-top appurtenances. c. Building D 1) Remove and properly dispose of existing surfacing (gravel); roof membrane and flashings; insulation board; etc. to prepare for the installation of a new roof membrane system. 2) Repair/replace any damaged/deteriorated steel roof deck. 3) Install two layers of 2.2" flat-stock polyisocyanurate insulation board; loose-laid over existing steel deck. 4) Install 1/2 " recovery board (4'x4' boards) over flat-stock polyisocyanurate insulation; mechanically fastened to existing steel deck. 5) Install 60-mil. TPO single-ply membrane; fully adhered with approved adhesive. 6) Install TPO single-ply flashing membrane utilizing approved adhesives and heat welding at membrane laps. 7) Install new TPO-coated metal pitch pans, where necessary. 8) Install new pre-finished sheet metal counter-flashings, penetration flashings, and other sheet metal components. 9) Install new pre-manufactured equipment supports, where indicated on drawings. 10) Install new TPO single-ply membrane walkway pads, where indicated on drawings. 11) Provide new sheet metal splash blocks at all downspouts. 12) Remove corrosion from, properly prepare and apply new paint to all roof-top appurtenances.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents