Similar Projects
Gillham, Grannis, and Hatfield Overlay (S)
Infrastructure
Bidding
$1,965,558 est. value

Gillham, Grannis, and Hatfield Overlay (S)
Infrastructure
Bidding
$1,965,558 est. value

Hot Mix On Specified County Roads
Infrastructure
Post-Bid
AR

8th Street Widening - SW I-Street to SE J-Street
Infrastructure
Post-Bid
Bentonville, AR

Denning and Scranton Overlay and Surfacing
Results
Denning, Scranton, AR

Hwy. 365 - Patsy Rd
Results
AR 72132

Asphalt Paving at the Elementary School Parking Lot
Infrastructure
Bidding
$200,000 est. value
Donaldson, AR

Construction of 6-Bay T-Hangar, Access Roads and Related Paving at Batesville Regional Airport
New Construction, Infrastructure
Post-Bid
$1,100,000 est. value
AR

Hihgway 59 - Pine Hollow Road (Overlay)
Infrastructure
Results
AR

I-49 – Benton Co. Line (Sel. Secs.) (S)
Infrastructure
Post-Bid
AR

CO. Road. 16 OVERLAY
Infrastructure
Results
AR

High Performance Cold Mix
Infrastructure
Post-Bid

Haskell Overlay and Surfacing
Infrastructure
Results
Haskell, AR

Gravette - Pea Ridge (SEL. SECS.)
Infrastructure
Post-Bid
AR

Paving Compost Facility and Two (2) Areas at the Ouachita Water Treatment Plant
Infrastructure
Results
Hot Springs, AR 71901

Last Updated 06/28/2022 05:20 AM
Project Title

Globe-Lordsburg Highway (US 70) (Tribal Rd 420 - Coolidge Dam R)

Physical Address View project details and contacts
City, State (County) Kirby, AR   (Pike County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work is located in Graham County on US70 between mileposts 279.50 and 293.40 near Peridot on the San Carlos Apache reservation. The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with a Bonded Wearing Course overlay. The project also includes spot repair work by milling and replacing with asphaltic concrete. Additional work includes replacing pavement markings and other miscellaneous work. AZDOT - Globe-Lordsburg Highway (US 70) (Tribal Rd 420 - Coolidge Dam R)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents