Similar Projects
Galbraith Road Bridge Over Anthony Wayne Avenu and NS Railway
Post-Bid
Cincinnati, OH 45202

Cordell Drive Bridge Reconstruction Project
Post-Bid
$445,000 est. value
Dayton, OH 45422

Western Campus Tunnel Removal and Presser Hall Bridge Rehabilitation
Results
Less than $1,435,000 est. value
Oxford, OH

Box Beam Replacement Program
Results
Less than $680,000 est. value
Cleveland, OH

Renovate the Pedestrian Garage Bridge, West Sinclair Community College
Post-Bid
Less than $2,175,000 est. value
Dayton, OH

Bridge Replacement - CR 38 over Wolf Creek
Results
Less than $618,125 est. value
Tiffin, OH

Bridge Repair - BH FY19 (A)
Results

Prestressed Concrete Box Beam
Results
Less than $92,925 est. value
Hillsboro, OH

Bridge Repair - SR 39-09.70
Results
OH

Bridge Repair - IR 77-20.16/Tus-US 250-18.90
Results
Dover, New Philadelphia, OH

Bridge 24G.2 Replacement
Results
Less than $270,133 est. value
Wauseon, OH 43567

Joe`s Run - Phase 2 Recreational Trail Bridge
Results
Less than $425,000 est. value
Zanesville, OH 43702

2019 Box Beams
Results
Wilmington, OH 45177

HAN-TR 150- 4.53 Bridge Rehabilitation
Results
Less than $438,000 est. value
Findlay, OH 45840

Lily Drive Bridge 1023-0.17 Replacement Project
Results
Less than $298,000 est. value
OH

Last Updated 01/09/2020 11:45 AM
Project Title

John Bryan State Park Lower Bridge Replacement

Physical Address View project details and contacts
City, State (County) Yellow Springs, OH   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $232,080
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the complete timber replacement of the superstructure (pedestrian bridge) at John Bryan State Park, existing piers and abutments will remain and only receive minor repairs if necessary. Work includes; demo of the existing timber structure, repair to concrete piers / abutments if necessary, replacement of glulam beams, decking and railing. No work is permitted below the Ordinary High-Water mark. This bridge crosses the Little Miami River, which is a National and State Scenic River, no in-water work will be allowed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents