Similar Projects
AMR South Grassflat 4, Cooper Township, Clearfield County
Infrastructure
Bidding
$500,000 CJ est. value
Cooper Township, PA 16858

23SC SGL 121 Broken Lace and SGL Cove Clearing
Infrastructure
Bidding
Marysville, PA 17053

Demolition of the Old Brooklyn School Building
Demolition, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Brooklyn Township, PA 18826

23 NE SGL 013 Frost Hollow Crop Tree
Term Contract
Sub-Bidding
Benton, PA 17814

Certified Domestic Well Water Sampling and Testing
Term Contract
Post-Bid
Newtown, PA

Remediation of Asbestos In the Lansdowne Theater
Renovation
Post-Bid
Lansdowne, PA 19050

1528 Barr Avenue Asbestos Abatement and House Demolition
Demolition
Results
Crafton, Pittsburgh, PA 15205

Additions and Alterations to Fairview High School - Asbestos Removal
Results
$44,200 est. value
Fairview, PA 16415

Charleroi Demolition
Demolition, Infrastructure
Sub-Bidding
$20,000 CJ est. value
Charleroi, PA 15022

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Asbestos Abatement Project at Wyomissing Area Junior/Senior High School
Alteration
Results
Wyomissing, PA 19610

Independence and North Franklin Demolition
Demolition, Infrastructure
Sub-Bidding
$70,000 CJ est. value
North Franklin Township, PA 15301

Asbestos Abatement - Reading School District Administration Building - 1st and 2nd Floors
Alteration
Post-Bid
Reading, PA 19601

Lease Base Paint Abatement Phase 2 at Harbor Homes
Alteration
Results
Erie, PA

Demolition and Site Restoration Project
Demolition, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Dupont, PA 18641

Last Updated 09/06/2022 02:09 PM
Project Title

Demolition Services for Various Scattered, Conventional and High-Rise Residential Properties

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19102   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 25, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** Questions Due Date: Jun 2nd 2022, 5:00 PM EDT Demolition Services for Scattered, Conventional and High Rise Residential Properties PHA encourages minority, woman-owned and Section 3 businesses to submit bids and participate in joint ventures. For inquiries related to this effort, contact vanessa.martin@pha.phila.gov. he Work consists of the conventional demolition and removal of one (1) building. Additionally, any related asphalt & concrete paved areas for utility line removals and as damaged by structure demolition will be removed and repaired. The project shall be a complete operation, which includes but is not limited to the following work components itemized below and specified in other parts of the specification documents. 1. Preparation of the site including vermin / rodent control and extermination 2. Site protection including adjacent private and public properties. 3. Site security, which may include, upon approval, fenced and gated entrances entering the site from the surrounding areas at the discretion of the DC Upon award of the contract the C.M. will be responsible to remove any third party dumping on site. Security shall be implemented to minimize such occurrences. A six (6) foot high cyclone fence will be installed around the property line upon final completion of the project. 4. Demolition, Removal and Legal Disposal of building as indicated with in this RFP. 5. Demolition, Removal and Legal Disposal of all demolition debris, underground foundations, and basements including concrete slabs for the buildings as indicated. 6. Demolition, Removal and Legal Disposal of all components, furnishings, and all other items contained within the buildings. 7. Removal and Legal Disposal of all existing site debris, currently located on site at the time of contract award. 8. Disconnection and capping of all water services and sewer services prior to any demolition of structures. All site gas supply must be terminated prior to any demolition and. D.C. shall confirm and re-test as necessary all gas supplies to assure termination and all lines purged prior to any demolition. All utility abandonment must be in full compliance with the utility companies and city jurisdiction methods, policies and procedures. D.C. will be responsible for any and all fees charged by the Philadelphia Gas Works (PGW) and Philadelphia Water Dept., for any required services rendered. All gas and water lines made visible during building demolition and located directly under building being removed must also be removed.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents