Similar Projects
Street Sweeping Disposal
Term Contract
Bidding
Newton, MA

De-Icing Services and Snow Removal 2020-2021
Term Contract
Post-Bid

Architectural and Engineering Services for the Construction of a New Intermodal Commuter Facility
Post-Bid
Newton, MA 02460

World-Wide Water Storage Tank Remediation
Term Contract
Results

Waban Hill Reservoir Improvements
Results
Less than $900,000 est. value
Newton, MA

Architectural and Engineering Services for Construction of new Main Entrance and Secondary Egress
Term Contract
Post-Bid
Newton, MA 02460

Hazardous Tree, Limb Removal and Stump Grinding S
Results
Concord, Lexington, Lincoln, MA

Herbicide Spraying - Fort Devens, MA
Post-Bid
Fort Devens, MA

S222--VISN 1 Solid Waste and Recycling Program Services
Results
Newington, West Haven, CT - Bedford, Brockton, Leeds, Randolph, West Roxbury, MA - Augusta, ME - Raeville, NE - Lee, Manchester, Portsmouth, NH - Providence, RI

Trash Containers and Removal Services
Post-Bid
Framingham, MA

Cedar Hill Tank
Results
Less than $2,750,000 est. value
Littleton, MA 01460

Bldg. 1723 Water Break
Post-Bid
Hanscom A F B, MA

Town Farm Water Storage Tank Rehabilitation Project
Results
Westford, MA 01886

Disposal of Street Sweeping and Catch Basin Cleaning Debris General Provisions
Post-Bid
Chelmsford, MA

State Forest Water Storage Tank
Results
$2,800,000 est. value
Dracut, MA 01826

Reported 06/02/2022 12:00 AM
Project Title

Norumbega Covered Storage Tank Cell No. 2 Cleaning

Physical Address View project details and contacts
City, State (County) Weston, MA   (Middlesex County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Hauling, Service/Term Contracts, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022, Construction Completion Expected July 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes sediment sampling and testing, isolating and dewatering, cleaning (including removal and disposal of accumulated sediment), monitoring and treating discharges, and disinfecting and reactivating the Norumbega Covered Storage Tank Cell No 2.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents