Similar Projects
Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

Pump Station 2.4 Installation - City of Brentwood
Infrastructure
Conception
Brentwood, CA 94513

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Walmart Warranty Work 2022
Infrastructure
Bidding
$300,000 est. value
Tehachapi, CA

Talbert Channel Storm Drain Repair Project
Infrastructure
Bidding
$86,289 est. value
Fountain Valley, CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

RFP - Upcoming RFP: Canal Maintenance Program CEQA and Permitting Support
Term Contract
Conception
San Jose, CA

Fort Baker Sewer and Manhole
Term Contract
Design
Mill Valley, CA 94941

Removal and Transport of Grit, Scum/Sludge, and Storm Water
Infrastructure
Bidding
San Diego, CA

Operation and Maintenance Services of Sewer and Water Systems in County Service Area (Csa) R-1967-1 Castlewood
Alteration
Post-Bid
CA

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Reported 06/24/2022 09:24 AM
Project Title

Storm System Expansions - 415020 - City of Morgan Hill

Physical Address View project details and contacts
City, State (County) Morgan Hill, CA 95037   (Santa Clara County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025, Construction Completion Expected December 2027
Bids Due View project details and contacts
Estimated Value $4,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Morgan Hill, California. Conceptual plans call for site work for a water / sewer project. This project is intended to construct improvements that support expanding storm drain system capacity in alignment with the 2018 Storm Drainage System Master Plan. Currently a capacity expansion within Fisher Basin is in progress. The purpose of the expansion will be to increase retention of storm water reducing the risk of flooding in the area and downstream through Fisher Creek. For FY 2022-23 increased storm water capacity will be targeted near the area of Monterey Rd. and Burnett Ave. to reduce flooding near the intersection. Future projects are being planned and prioritized and design will occur in future years. This project is in included in the City of Morgan Hill FY 2022-2028 Capital Improvement Plan (CIP). As of June 23, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents