Similar Projects
Last Updated | 01/04/2024 06:31 PM |
Project Title | Bridge Replacement With 33-Inch Concrete Prestressed Box Beams, Concrete Abutments With Steel H-Piles and Approach Work on Bowman Road |
Physical Address | View project details and contacts |
City, State (County) | Imlay City, MI 48444 (Lapeer County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2024 |
Bids Due | View project details and contacts |
Estimated Value | $1,311,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bridge replacement with 33-inch concrete prestressed box beams, concrete abutments with steel H-piles and approach work on Bowman Road over Belle River Drain, Lapeer County. This is a Local Agency project. Net classification required for this project is 1311 Fa Control Sec Job No Federal No BO 44000 214468A 24A0136 MI DOT - 2402 004 - Bridge Replacement With 33-Inch Concrete Prestressed Box Beams, Concrete Abutments With Steel H-Piles and Approach Work on Bowman Road |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |