Similar Projects
Mockingbird Hills Subdivision Improvement - 509 - City of San Marcos
Infrastructure
Conception
$8,420,000 est. value
San Marcos, TX 78666

Lookout
New Construction - 26,000 SF
Design
$44,550,000 est. value
Austin, TX 78737

Whisper South Amenity Center
New Construction - 5,061 SF
Design
$1,000,000 est. value
San Marcos, TX 78666

Widen Road - Add Lanes and Shoulders - FM 621
Infrastructure
Bidding
$2,765,187 CJ est. value
San Marcos, TX 78666

RM 12 - Widen Road - Add Lanes
Infrastructure
Bidding
$4,135,673 CJ est. value
San Marcos, TX 78666

FM 2001 - Crack Seal
Infrastructure
Sub-Bidding
$288,528 CJ est. value
Buda, TX 78610

Elder Hill Road - Raised Profile Striping
Infrastructure
Sub-Bidding
$20,000 CJ est. value
Driftwood, TX 78619

Construction of Kissing Tree West Centerpoint Road Phase 3A
Infrastructure
Post-Bid
San Marcos, TX 78666

Loop 360 Water Supply Corporation Additional 300k Ground Storage Tank Improvements
Infrastructure
Post-Bid
$600,000 CJ est. value
Austin, TX 78701

San Marcos Area Office Refresh
Results
Less than $58,492 est. value
San Marcos, TX 78666

Brush Square - Phase 1 Implementation
Infrastructure
Results
$2,200,000 est. value
Austin, TX

AAA Self Storage Expansion Phase II / Dripping Springs
New Construction, Infrastructure - 70,400 SF
Pending Verification
$3,800,000 CJ est. value
Dripping Springs, TX 78620

Kissing Tree / Club House
New Construction, Infrastructure - 6,921 SF
Pending Verification
$1,000,000 CJ est. value
San Marcos, TX 78666

Dripping Springs Apartments
New Construction - 263,532 SF
Design
$41,627,800 est. value
Dripping Springs, TX 78620

Francis Harris Lane - Low Water Crossing
Infrastructure
Bidding
$200,000 CJ est. value
San Marcos, TX 78666

Last Updated 07/28/2022 03:33 PM
Project Title

Luxe of Buda

Physical Address View project details and contacts
City, State (County) Buda, TX 78610   (Hays County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 28 2022 this project is in working drawings complete still, This will be a new clubhouse

Details

7,066 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents