Similar Projects
WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Post-Bid
Kaibito, AZ

System Preservation (Restoration/Rehab/Resurface)
Results
$21,000,000 est. value
Flagstaff, AZ 86004

Guardrail Improvements and Shoulder Widening
Results
$5,400,000 est. value
Pine, AZ 85544

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Coconino Estates Phase II Improvements
Results
Flagstaff, AZ

Forest Road Connection Project
Infrastructure
Post-Bid
Sedona, AZ 86351

Road Construction IDIQ - Coconino & Kaibab National Forests
Results
$1,000,000 to $10,000,000 est. value
Flagstaff, AZ 86001

N1012 3.50 Mile to Nanees Dizi, Road Improvement
Infrastructure
Post-Bid
Tuba City, AZ 86045

Slurry Seal FY21
Results
Page, AZ

Los Abrigados to Brewer Road Connection Project
Infrastructure
Post-Bid
$150,000 est. value
Sedona, AZ 86336

CMAR - Design and Construction Services for Beulah/University Roadway Project
Infrastructure
Results
$11,700,000 to $11,800,000 est. value
Flagstaff, AZ

Page Municipal Airport - Segmented Circle Relocation
Infrastructure
Post-Bid
Page, AZ 86040

System Preservation (Engineering)
Infrastructure
Results
Sedona, AZ 86351

Reported 07/20/2022 12:00 AM
Project Title

National Forest System Road (NFSR) 700 and 91 Road Surfacing

Physical Address View project details and contacts
City, State (County) Flagstaff, AZ   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of reconditioning and surfacing with crushed aggregate 7.2 miles of FSR 700 and 3.0 miles of FSR 91. There are also Options A-B for the reconditioning and resurfacing with crushed aggregate for an additional 2.00 miles of FSR 700 and Options C-E for the reconditioning and resurfacing with crushed aggregate for an additional 3.00 miles of FSR 91. This work consists of reconditioning ditches, shoulders, roadbeds, aggregate surfaces, or the entire road. The contract is to utilize an existing IDIQ awarded for the Kaibab and Coconino National Forests in 2021 for award to predetermined qualified contractors. For the first four miles of FSR 700 this project will utilize a government source located at Coyote Pit which is accessed 1.82 miles south of the contract start on FSR 700. The remaining miles on FSR 700 and all of the FSR 91 contract will utilize a government source located at Perry Pit which is located at LATITUDE: 34.997119N LONGITUDE: -111.446611W off of COC-3.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents