Similar Projects
Project Diamond Vault
New Construction, Infrastructure
Conception
$1,400,000,000 CJ est. value
Lena, LA 71447

Dolly Paul Road New Fire Station - Rapides Parish Police Jury
New Construction, Infrastructure
Design
$3,583,815 CJ est. value
Glenmora, LA 71433

Us 71: Uprr Overpass Clr Adjustment
Infrastructure
Design
$2,500,000 CJ est. value
Alexandria, LA 71302

Huffman Creek Pump Station and Outfall
Demolition, Renovation, Infrastructure
Bidding
$7,200,000 CJ est. value
Pineville, LA 71360

Wastewater Treatment Plant Improvements and Inflow/Infiltration Repairs
Infrastructure
Bidding
$935,000 CJ est. value
Alexandria, LA 71301

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

US 71: Turn Lanes for Emerg Staging Area
Infrastructure
Results
$500,000 to $1,000,000 est. value
LA

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

Kisatchie Ground Storage Aeration - REBID
Infrastructure
Construction
$1,880,200 CJ est. value
Alexandria, LA 71301

R.I.V.E.R. Act Implementation-Phase 2 Z Walks, Steps and Paver Replacement
Infrastructure
Construction
$4,051,900 CJ est. value
Alexandria, LA 71301

Beaver Lake Renewable Energy
New Construction, Infrastructure
Pending Verification
$1,800,000,000 CJ est. value
Pineville, LA 71360

La 1207: La 115 to La 28
Infrastructure
Design
$2,500,000 CJ est. value
Buckeye, LA 71328

Synthetic Track and Field Event Improvements
Infrastructure
Bidding
$760,000 CJ est. value
Alexandria, LA 71303

Fairground and Machine Shop Addition Flood Control Improvements - City of Alexandria
Infrastructure
Post-Bid
$640,000 CJ est. value
Alexandria, LA 71302

Last Updated 02/20/2024 09:33 AM
Project Title

Elliott St. Rehab: Macarthur Dr to I-49

Physical Address View project details and contacts
City, State (County) Alexandria, LA 71301   (Rapides County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Type Improvement Roadway Reconstruction Length 2.00 miles Parish : Rapides Estimated Cost Range $1,000,000 to $2,500,000 As of July 27, 2022, the project is in Design status. Anticipated letting date is December 14, 2022. LADOT - Elliott St. Rehab: Macarthur Dr to I-49 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents