Similar Projects
West End Apartments
New Construction, Infrastructure
Conception
$150,000,000 CJ est. value
Edwards, CO 81632

Roundabout Cooley Mesa Rd/Siena Lake Parkway - Town of Gypsum
Infrastructure
Conception
$1,000,000 CJ est. value
Gypsum, CO 81637

Highline Doubletree
Addition, Demolition, Build-out, Renovation, Infrastructure - 45,250 SF
Design
$13,600,000 CJ est. value
Vail, CO 81657

Edwards RiverPark
New Construction, Infrastructure - 36,500 SF
Design
$215,700,000 CJ est. value
Edwards, CO 81632

I-70 Vail Pass Auxilary Lane
Infrastructure
Bidding
$20,000,000 CJ est. value
Edwards, CO 81632

Schoolside Roundabout
Infrastructure
Bidding
$2,000,000 CJ est. value
Gypsum, CO 81637

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

East Park Improvements and North Restrooms, Harry A. Nottingham Park
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Avon, CO 81620

56--Fencing, Tarping and Debris Removal
Demolition
Results

Dowd Junction Lift Station 4 and Force Main Replacement
New Construction, Alteration
Results
Eagle, CO

Vail Health Northstar Center
Demolition, New Construction, Infrastructure, Build-out - 170,000 SF
Construction
$5,000,000 CJ est. value
Edwards, CO 81632

Lionshead Place / Multi-Residential
New Construction, Infrastructure
Pending Verification
$1,100,000 CJ est. value
Vail, CO 81657

435 Eby Creek Apartments
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Eagle, CO 81631

Jules Drive and Highway 6 Roundabout or Traffic Light - Town of Gypsum
Infrastructure
Conception
$2,500,000 CJ est. value
Gypsum, CO 81637

Village Plaza Building 2 / Sushi Oka
Addition, Demolition, Infrastructure
Design
$90,000 CJ est. value
Vail, CO 81657

Last Updated 04/14/2023 09:11 AM
Project Title

Gypsum Skate Park 2023

Physical Address View project details and contacts
City, State (County) Gypsum, CO 81637   (Eagle County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

At said place and time, and promptly thereafter, all bids that have been duly received will be opened publicly and read aloud. All interested parties are invited to attend. The Owner reserves the right to reject any and all bids and to waive irregularities or informalities in any bid. The work to be performed generally includes: Highly skilled craftsmen performing the "art" of skate park construction through the tasks of excavation, drainage, aggregate placement, reinforcing & forming for concrete and shotcrete, placing cementitious products to create a quality skate park for Gypsum. Each Bidder shall file with his Bid a cashier's check, or a Bid Bond, in accordance with the Instructions to Bidders. The Bidder to whom a Contract is awarded will be required to furnish a Performance, Payment and Warranty Bond guaranteeing faithful performance and warranty for two years. No Bids may be withdrawn within a period of sixty (60) days after the date Bids are opened.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents