Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ Design - New Edgar County Jail
New Construction, Infrastructure
Bidding
$55,794,000 CJ est. value
Paris, IL 61944

Rock
Post-Bid
Paris, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2.579 Miles of Cape Seal Operations from ILL130 South to ILL 49
Results

3P Policy Standard Overlay, Misc. Roadway Work, New Shoulders, Milled Rumble Strip
Infrastructure
Results
IL

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

New Road Construction
Infrastructure
Post-Bid
Paris, IL 61944

Street Improvements
Infrastructure
Results
Chrisman, IL

RFQ - Various Phase III Construction Engineering Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Seal Coat
Infrastructure, Alteration
Post-Bid
Paris, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

RFQ - Various Phase II Traffic Signal Coordination and Timing (SCAT) Projects, Various Routes
Term Contract
Design
$300,000 CJ est. value
Springfield, IL 62703

Last Updated 08/05/2022 06:07 AM
Project Title

RFQ Engineering - Phase I/II 3P Policy Designed Overlay Project

Physical Address View project details and contacts
City, State (County) Chrisman, IL 61924   (Edgar County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $5,400,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

ob No. P-95-009-22, Phase I/II 3P Policy Designed Overlay Project, US 150 from Lower Terre Haute Rd in Paris to Laurel Ln E Of Paris, Edgar County, Region Three/District Five. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 26, 2022, at 10:00 AM at the Region Three/District Five Office in Paris Phase I and II engineering services are required for the preparation of a project report and final contract plans, specifications, and cost estimates for the 3P Resurfacing of FAP 91 (US 150) from Lower Terre Haute Rd in Paris to Laurel Ln E Of Paris (Including Intersection at Sulphur Springs Rd / Court St) in Edgar County. The Consultant's Phase I work, if required, may consist of preparing a Project Report. This work may include data collection, Intersection Design Study, left turn lane addition studies, multi-use path addition studies, cost estimates, traffic management analysis, traffic control plans, crash analysis, quantity computations, public information meetings, stakeholder meetings and other related work items required to produce a project report. The Consultant's Phase II work, if required, may consist of preliminary and final roadway plans, special provisions, estimates, ROW plats and plans, 3D model, and any other related work required to complete Phase II. The estimated construction cost for this project is $5,400,000. The project is tentatively set for a January 2025 Letting. The completion date for this contract will be 60 months after authorization to proceed. A planned Supplement for Phase II will be done near the completion of Phase I. The Prime firms must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 029 RFQ Engineering - Phase I/II 3P Policy Designed Overlay Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents