Last Updated | 08/05/2022 06:07 AM |
Project Title | RFQ Engineering - Phase I/II 3P Policy Designed Overlay Project |
Physical Address | View project details and contacts |
City, State (County) | Chrisman, IL 61924 (Edgar County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,400,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ob No. P-95-009-22, Phase I/II 3P Policy Designed Overlay Project, US 150 from Lower Terre Haute Rd in Paris to Laurel Ln E Of Paris, Edgar County, Region Three/District Five. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 26, 2022, at 10:00 AM at the Region Three/District Five Office in Paris Phase I and II engineering services are required for the preparation of a project report and final contract plans, specifications, and cost estimates for the 3P Resurfacing of FAP 91 (US 150) from Lower Terre Haute Rd in Paris to Laurel Ln E Of Paris (Including Intersection at Sulphur Springs Rd / Court St) in Edgar County. The Consultant's Phase I work, if required, may consist of preparing a Project Report. This work may include data collection, Intersection Design Study, left turn lane addition studies, multi-use path addition studies, cost estimates, traffic management analysis, traffic control plans, crash analysis, quantity computations, public information meetings, stakeholder meetings and other related work items required to produce a project report. The Consultant's Phase II work, if required, may consist of preliminary and final roadway plans, special provisions, estimates, ROW plats and plans, 3D model, and any other related work required to complete Phase II. The estimated construction cost for this project is $5,400,000. The project is tentatively set for a January 2025 Letting. The completion date for this contract will be 60 months after authorization to proceed. A planned Supplement for Phase II will be done near the completion of Phase I. The Prime firms must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 029 RFQ Engineering - Phase I/II 3P Policy Designed Overlay Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||
Details |
|
||||