Similar Projects
Silver Diner Restaurant
New Construction, Demolition - 11,513 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Annapolis, MD 21401

Burger King At Brooklyn Park
New Construction - 3,468 SF
Design
$500,000 to $1,000,000 CJ est. value
Brooklyn Park, MD

Millers Ale House
New Construction - 7,246 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Annapolis, MD 21401

Fourth Street Restaurant and Residential
New Construction, Demolition - 6,819 SF
Post-Bid
Annapolis, MD 21403

Starbucks #58386
Build-Out - 2,303 SF
Post-Bid
Pasadena, MD 21122

Popeyes
New Construction - 2,239 SF
Construction
$500,000 to $1,000,000 CJ est. value
Severna Park, MD 21146

Annapolis Street Mixed Use Development
New Construction, Demolition - 12,098 SF
Construction
$3,500,000 est. value
Annapolis, MD 21401

`Dashery
Build-Out
Pending Verification
Baltimore, MD 21201

Arby's
Build-Out
Pending Verification
Baltimore, MD

Burger King #1159
Renovation - 3,258 SF
Design
Hanover, MD 21076

Domino`s Pizza #9353
Renovation - 1,488 SF
Post-Bid
Annapolis, MD 21401

Marco's Pizza #2031
Renovation - 1,590 SF
Construction
Gambrills, MD 21054

198 Commerce Center
New Construction - 4,893 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Laurel, MD 20724

RAR Brewing
Renovation
Design
Annapolis, MD 21401

Domino`s #4652
Renovation - 2,200 SF
Post-Bid
Annapolis, MD 21403

Reported 07/19/2022 09:53 AM
Project Title

Arby`S / Baltimore

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21224   (Anne Arundel County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to renovate an existing building to be used as a new fast food restaurant. As of July 18, 2022, this project is in the early planning stages. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to fourth quarter of 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Food/Beverage Service, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents