Similar Projects
Construction Connect Condenser Pumps To Emergency Power
Renovation
Sub-Bidding
$5,000,000 CJ est. value
New Orleans, LA 70119

South Terminal Building 12 Metal Roof and Metal Panels Repair
Renovation
Sub-Bidding
$290,000 CJ est. value
Kenner, LA 70062

Plumbing for Diagnostic Inspections and Repairs
Alteration
Post-Bid
LA

Water Bottle Filling Stations
Alteration
Post-Bid
New Orleans, LA

Remove and Replace one (1) 1.5 Inch Slow Close Solenoid Valve at Johnny Jacobs Playground Pool
Alteration
Results
Gretna, LA

One Time Purchase of Pipe to be Used for Waterline Re-Location Project
Infrastructure, Alteration
Results
Kenner, LA 70097

Plumbing Services (Labor Only)
Alteration
Post-Bid
Kenner, LA

Temporary Tap Installation
Alteration
Results
$500,000 est. value
Kenner, LA

Remove and Dispose of Existing Drinking Fountains and Install Provided Drinking Fountains for Jeffcap Head Start Locations
Alteration
Post-Bid
LA

Provide Plumbing, HVAC, Information Technology and Electrical Service
Alteration
Post-Bid
LA

South Campus Utility Building Fire Restoration
Renovation
Post-Bid
Kenner, LA 70062

Plumbing Maintenance Services
Alteration
Post-Bid
New Orleans, LA

Emergency Bid - West Terminal
Renovation
Post-Bid
$200,000 est. value
Kenner, LA 70062

On Call Plumbing Services at all HANO Owned Properties
Alteration
Post-Bid
New Orleans, LA

Provide and Install New PVI Hot Water Heater
Renovation
Post-Bid
$200,000 CJ est. value
New Orleans, LA 70126

Last Updated 08/05/2022 03:02 AM
Project Title

NOAB - Air Compressor

Physical Address View project details and contacts
City, State (County) Kenner, LA 70062   (Jefferson County)
Category(s) Single Trades, Transportation
Sub-Category(s) Airline/Passenger Terminal, Plumbing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of New Orleans (City) and New Orleans Aviation Board (NOAB) solicits quotes to obtain a contract for air compressor installations (Air Compressor Installations), for the South-side Terminal of the Louis Armstrong New Orleans (West Plant & West Plant Expansion) International Airport (South Terminal). The Contractor will be responsible for the replacement and installation of two (2) air compressors and two (2) driers for the air compressors. a. Air Compressor #1 (located at South Terminal West Plant) - Champion Duel 5 HP 34.6 cfm, 120-gallon horizontal tank with refrigerated air drier. b. Air Compressor #2 (located at South Terminal West Plant Expansion) - Champion Duel 5 HP, 40.4 cfm, 120-gallon horizontal tank with refrigerated air drier. 2. Contractor shall remove and dispose of existing air compressors and driers (including loading and hauling and all equipment/materials required to do so). 3. Contractor shall perform rigging of new equipment, including: (Drain down to be performed by facilities prior to shut down and removal.) a. Tie into existing pneumatic piping. b. Tie into existing electrical and existing building controls. c. Set new drain lines. (refill to be performed by facilities prior to start up) d. Start up and commissioning. 4. All materials shall be Original Equipment Manufacturer (OEM) or equivalent. 5. Contractor shall take all precautions to prevent any construction materials and debris from entering the secured air side of building. 6. SIDA badging and operational requirements and restrictions while working on an active airfield will be enforced. Access to airside work areas shall be through Gate 167. 7. Standard safety procedures shall be implemented, and contractor must ensure qualified personnel are assigned to successfully complete all tasks. 8. All work shall be completed within 60 calendar days of issuance of Notice to Proceed (NTP). 9. Contractor is to verify all dimensions and estimates for equipment. 10. Contractor shall notify MSY upon completion of work to schedule final inspection and acceptance, prior to issuance of final payment. Contractor to submit before and after pictures of the work areas.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.