Similar Projects
Percheron Master Plan
New Construction
Conception
Colorado Springs, CO 80902

Foothills Farm Campus - Phase II
New Construction - 20,400 SF
Design
Colorado Springs, CO 80921

Foothills Farm Campus - Phase III
New Construction - 20,400 SF
Design
Colorado Springs, CO 80921

Pueblo County Weatherization Furnace Replacement
Alteration
Bidding
$50,000 est. value
Colorado Springs, CO

Maintenance Shop Retrofit
Renovation
Bidding
$430,000 est. value
Colorado Springs, CO 80903

Venetucci and Widefield Elementary HVAC
Renovation
Sub-Bidding
$70,000 CJ est. value
Colorado Springs, CO 80903

Improvements to the HVAC System Windows and Indoor Air Quality Berg Building
Post-Bid
Less than $1,417,414 est. value
Colorado Springs, CO 80900

HVAC and Mechanical Products
Term Contract
Post-Bid

Pioneers Museum Offsite Storage HVAC Upgrade
Results
Less than $399,830 est. value
Colorado Springs, CO 80903

Hoods & Ducts Cleaning, Peterson AFB
Results
Colorado Springs, CO 80914

In-N-Out Burger Distribution Center & Office Building
New Construction - 197,900 SF
Construction
$10,000,000 est. value
Colorado Springs, CO

Cygnet Heights Office and Industrial Development (Coca-Cola)
New Construction - 350,000 SF
Construction
$10,000,000 est. value
Colorado Springs, CO

Reagan Ranch
New Construction
Pending Verification
Colorado Springs, CO 80929

Falcon Trucking Mixed Use
New Construction
Pending Verification
Colorado Springs, CO 80902

Compassion Headquarters / Colorado Springs
Renovation
Design
$10,000,000 est. value
Colorado Springs, CO 80921

Last Updated 07/22/2022 02:35 PM
Project Title

HVAC Air Purification System Transit Administration Building

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Commercial, Single Trades, Transportation
Sub-Category(s) HVAC, Misc. Structures, Office
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Colorado Springs dba Mountain Metropolitan Transit (MMT), applied for and was awarded a Discretionary Public Transportation COVID-19 Research and Development Grant through the U.S. Department of Transportation and Federal Transportation Administration. MMT, would like to receive bids from licensed Heating, Ventilation and Air Conditioning (HVAC) contractors, specializing in commercial air disinfection systems, to provide and install Ultraviolet -C (UVC) lighting system and High Efficiency Particulate Air (HEPA) filtration in an existing HVAC system. MMT intends to utilize one Contractor to provide and install the UVC Lighting System and HEPA Filtration. The contract will be valid for only the tasks related within the scope of work, with no renewal options. Buyer's Requirements General Requirements - Insurance Required - Contractors License Required - Warranty Information Required - Installation Required - Prevailing Wage Required - License Required - Federally Funded - Certified Payroll Question Acceptance Deadline 05/27/2022 07:00 PM EDT Questions are submitted online No The City of Colorado Springs dba Mountain Metropolitan Transit (MMT), applied for and was awarded a Discretionary Public Transportation COVID-19 Research and Development Grant through the U.S. Department of Transportation and Federal Transportation Administration. MMT, would like to receive bids from licensed Heating, Ventilation and Air Conditioning (HVAC) contractors, specializing in commercial air disinfection systems, to provide and install Ultraviolet -C (UVC) lighting system and High Efficiency Particulate Air (HEPA) filtration in an existing HVAC system. MMT intends to utilize one Contractor to provide and install the UVC Lighting System and HEPA Filtration. The contract will be valid for only the tasks related within the scope of work, with no renewal options. The contractor shall perform a site visit to survey existing HVAC equipment. The contractor shall provide samples for Transit approval. An estimated timeline to procure materials and project completion is required prior to schedule approval. The work involved shall include, but not be limited to the following: 1) Provide all required Samples, Submittals and Mockups as requested. 2) Provide all preparation, materials, disposal, equipment, transportation, tools and labor. 3) Contractor shall supply operational and system efficacy data, to support the purchase and/or use of the product(s) offered as part of this solicitation ) The UVC Lighting System shall be internally mounted in existing HVAC equipment. 5) The UVC Lighting System shall be easily serviceable. 6) The UVC Lighting System shall have an access door or window for periodic lamp inspection. 7) The UVC Lighting System shall have an external disconnection switch or control, so system can be deactivated for HVAC AHU service. 8) The UVC Lighting System shall have external mounted ballasts and/or controls. 9) The UVC Lighting System lamps operating service hours, shall be a minimum of 12 months/9,000 hours, before change is required. 10)HEPA Filtration shall be specifically designed and sized to fit existing HVAC System Equipment.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Multiple Seating, Pews and Benches, Benches.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents