Similar Projects
Last Updated | 07/14/2020 05:01 AM |
Project Title | Partial Reroofing at Bonneville Jr. and Spring Lane Elementary |
Physical Address | View project details and contacts |
City, State (County) | Holladay, UT 84117 (Salt Lake County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To perform Partial Re-Roofing work to Spring Lane Elementary School and Bonneville Junior High School. This includes items such as: 1. Protection of existing building, roof mounted equipment and appurtenances, sidewalks, and site adjacent to work area 2. Removal of designated areas of roofing system to existing metal deck, including, but not limited to: roof membrane, insulation, cover boards, vapor barriers, flashings, caps, roof edges, expansion joints, and any required asbestos abatement 3. Replacing roof drains 4. Installation of new roofing systems 5. Installation of roof hatch safety cages |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |