Similar Projects
North Laurel Elementary School - Parking Lot Rehabilitation
Post-Bid
Laurel, DE 19956

Delaware Avenue Sidewalk Replacement
Post-Bid
Laurel, DE 19956

Parking Lot
Results
Ocean View, DE 19970

Lewes BPW Parking Lot Addition
Results
Lewes, DE 19958

Museum Parking Lot Paving
Post-Bid
Seaford, DE

Frankford Sidewalk Improvements
Results
Frankford, DE 19945

Spring Street Additional Parking
Infrastructure
Post-Bid
Seaford, DE 19973

Montessori School Deldot Entrance and Parking Lot Paving
Results
Seaford, DE

Open-End Pedestrian Access Routes and Sidewalk Improvements
Infrastructure
Post-Bid

Millsboro Main Street Sidewalk Replacement Project
Results
Millsboro, DE 19966

Savannah Road Sidewalk Improvements
Infrastructure
Post-Bid
Lewes, DE 19958

Junction and Breakwater Pathway, Rehoboth Beach Extension
Results
Less than $513,294 est. value
Rehoboth Beach, DE 19971

Dune Walkway Construction and Replacement
Results
South Bethany, DE 19930

Sports Complex Sidewalk Extension
Results
Seaford, DE

Georgetown to Lewes Trail Phase 8
Results
Georgetown, DE 19947

Reported 09/30/2021 12:00 AM
Project Title

West State Street Sidewalk Replacement

Physical Address View project details and contacts
City, State (County) Millsboro, DE 19966   (Sussex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of Furnishing and installing 1,225 lineal feet of DelDOT Type 3-6 Curb and Gutter, 410 lineal feet of DelDOT Type 3-4 Curb and Gutter, 5,125 square feet of sidewalk, 1,520 square feet of Driveway Apron Sidewalk, 1,050 square feet of Sidewalk Ramps, 70 square feet of Crosswalk Landings, 260 square feet of Concrete Driveway Transitions, 660 square feet of Asphalt Driveway Transitions, one (1) 34” x 24” Drainage Inlet, three (3) 34” x 18” Drainage Inlets, 170 lineal feet of 12” Reinforced Concrete Stormwater Pipe, 200 lineal feet of 18” Reinforced Concrete Stormwater Pipe, 30 lineal feet of Reinforced Concrete Stormwater Pipe Across State Street, one (1) Sign and Signpost, Abandoning a Stormwater Pipe In Place, and Private Property Transitions.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents