Similar Projects
SH 358 - Resurface Roadway
Infrastructure
Bidding
$5,590,469 est. value
TX

Leopard Drive (Palm Drive to Crosstown Expressway)
Infrastructure
Bidding
Corpus Christi, TX 78473

Meter Boxes and Lids for the City Warehouse
Term Contract
Post-Bid
Corpus Christi, TX 78401

Schedule 40 PVC Pipe
Term Contract
Post-Bid
Corpus Christi, TX

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Residential Street Rebuild Program Year 2019 Re-Bid Part A
Results
Less than $5,513,303 est. value
Corpus Christi, TX 78401

Storm Water Management Services
Post-Bid
Corpus Christi, TX

Paving and Striping of Parking Lot
Results
Less than $249,596 est. value
TX

Bond 2016 Parking Lot Improvements at Schanen Estates and Oak Park Elementary Schools
Infrastructure
Post-Bid
Corpus Christi, TX 78413

Cargo Dock 9 Stormwater and Wastewater Improvements & Cargo Dock 9 Pavement Improvements
Results
Corpus Christi, TX

Bldg 1869 Concrete at NAS Corpus Christi, TX
Term Contract
Post-Bid
Less than $250,000 est. value
Corpus Christi, TX

Concrete Paving at Wiggins Cottages
Results
Less than $148,259 est. value
Corpus Christi, TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Lifecycle Curb and Gutter Replacement
Results
Corpus Christi, TX

Polyethylene Fittings
Term Contract
Post-Bid
Corpus Christi, TX

Last Updated 05/04/2022 06:22 AM
Project Title

South Oso Parkway (S. Staples to S. Oso Parkway)

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX 78473   (Nueces County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the new construction of South Oso Parkway from Staples Street to South Oso Parkway. The project will also include an asphalt pavement parking lot at the East side of South Oso Parkway. The construction will include, but not limited to the following items: demolition of existing improvements, installation of sidewalk, curb and gutter, pavement, storm sewer, waterline adjustments, gas line adjustments, and incidentals.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents