Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

Gaoa - Salmon River Road Corridor Rec. Site Maintenance (Surface Rock) 4Cn
Term Contract
Design
$100,000 to $250,000 est. value
ID

Constructing a New Eastbound Port of Entry (Poe) Facility on I-84 at MP 219 and Removing the Existing Cotterel POE
Infrastructure
Bidding
$10,000,000 to $15,000,000 est. value
ID

Intersection SH 47 Improvements, Ashton
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

US 20, Intersection SH 47 Improvements
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
Ashton, ID

Kathleen Avenue Improvements
Infrastructure
Post-Bid
Coeur d'Alene, ID 83815

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Reconstructing the Intersection of US 20, MP 360.572, and SH 47, MP 0.000, and Installing a Traffic Signal
Infrastructure
Bidding
ID

For the Work of Performing Preventative Pavement Maintenance on All State Roads in Power County
Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value
ID

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Honeysuckle Avenue and 4th Street
Infrastructure
Post-Bid
Hayden, ID 83835

Last Updated 02/20/2022 08:14 AM
Project Title

Hemmert Avenue Railroad Crossing

Physical Address View project details and contacts
City, State (County) Idaho City, ID   (Boise County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $653,104
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall consist fo the Contractor furnishing all tools, labor, equipment, and materials necessary to remove 3000 SY of roadway and place approximately 430 LF of 48” storm pipe, 150 LF of 12” storm pipe, 1150 LF of curb & gutter, 1500 SY of concrete sidewalk, 3150 CY of aggregate subbase, 2100 CY of aggregate base, 825 tons of plant mix pavement, and any additional items

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents