Similar Projects
Mcgee Street Bridge - Erosion and Overlay Repairs - City of Sherman
Infrastructure
Conception
$900,000 CJ est. value
Sherman, TX 75092

Lamberth Road Expansion - Shady Oaks To Friendship Road - City of Sherman
Infrastructure
Conception
$4,600,000 CJ est. value
Sherman, TX 75090

Freedom Jeep Showroom Addition / Sherman
Addition, Demolition, Infrastructure - 9,629 SF
Design
$2,500,000 CJ est. value
Sherman, TX 75092

Hickory Hill Residential
New Construction, Infrastructure
Design
$95,000,000 CJ est. value
Sherman, TX 75092

Hazard Elimination and Safety - US 82
Infrastructure
Bidding
$6,383,895 CJ est. value
Sherman, TX 75092

Waterloo Lake Sanitary Sewer Improvements Phase I
Infrastructure
Bidding
$2,000,000 CJ est. value
Denison, TX 75021

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Mass Grading Operations for Churchill
Infrastructure
Post-Bid
Van Alstyne, TX

Water Distribution System Improvements & Waterline Improvements
Infrastructure
Results
$500,000 to $900,000 est. value
Whitewright, TX

Chloramine Conversion and Take Point Improvements Project
Infrastructure
Results
Howe, TX

Hampton Inn & Suites Sherman
New Construction, Infrastructure - 49,260 SF
Pending Verification
$6,000,000 CJ est. value
Sherman, TX 75092

QuikTrip #1915
New Construction, Infrastructure - 5,312 SF
Pending Verification
$725,000 CJ est. value
Sherman, TX 75090

Progress Drive Construction - Progress Rail And Flanary Road - City of Sherman
Infrastructure
Conception
$2,100,000 CJ est. value
Sherman, TX 75092

2100 North Travis Street Self Storage
New Construction, Infrastructure - 101,600 SF
Design
$11,000,000 CJ est. value
Sherman, TX 75092

Mantua Point Phase 2A and 2B Grading Package
Infrastructure
Post-Bid
Van Alstyne, TX

Last Updated 10/25/2022 04:10 PM
Project Title

Water Meter Supply Project

Physical Address View project details and contacts
City, State (County) Bells, TX 75414   (Grayson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

The Greater Texoma Utility Authority (GTUA) (Owner) on behalf of the City of Bells, TX (City) is seeking proposals from Contractors to supply approximately 700 Automated Meter Reading (AMR)- and Advanced Metering Infrastructure (AMI)- compatible water meters and associated software. This water meter replacement project will modernize water infrastructures in Bells through improving data collection and enhancing service. These water meters will ultimately connect to a future Advanced Metered Infrastructure (AMI) system for monitoring and control.connect to a future Advanced Metering Infrastructure (AMI) system for monitoring and control. Submit questions via email to mschmitz@anterogroup.com or gnemeth@anterogroup.com. The envelope must be sealed and clearly marked "WATER METER SUPPLY PROJECT". The Project Consists of: Supply of 700 AMR/AMI-compatible water meters for replacement in the City of Bells, including residential, public, and commercial buildings. Approximately 690 meters are 3/4" or 5/8"; approximately 10 meters are 2" in size. A bid bond in the amount of five percent (5%) of the bid issued by an acceptable surety shall be submitted with each bid. A certified check or bank draft payable to the Greater Texoma Utility Authority or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. The Greater Texoma Utility Authority reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by GTUA for a period not to exceed 60 days from the date of the bid opening for the purpose of receiving bids and investigating the bidder's qualifications prior to the contract award. The contract will be contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Notice for Bids are expected to be funded in part by a loan from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this Notice for Bids or any resulting contract. Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, handicap, age or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60 Any contracts awarded under this Notice for Bids is/are subject to U.S. Iron and Steel requirements.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents