Similar Projects
Flagler Creative
New Construction, Build-Out - 435,781 SF
Design
$10,000,000 CJ est. value
Fort Lauderdale, FL 33304

2027 Fletcher
New Construction - 24,037 SF
Design
$9,000,000 est. value
Hollywood, FL 33020

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

Broward Estates Elementary School - Smart Program Renovations
Renovation
Results
$5,556,517 to $1,855,849 est. value
Fort Lauderdale, FL 33311

Indian Trace Elementary School SMART Program
Results
$8,242,000 est. value
Fort Lauderdale, FL 33326

One 24 Residence
New Construction - 21,398 SF
Construction
$3,397,464 est. value
Fort Lauderdale, FL 33300

The Residences at Equality Park
New Construction
Construction
$13,433,987 est. value
Wilton Manors, FL 33305

RFQ - Redevelop the Existing East and West Buildings of the Fort Lauderdale Aquatic Complex
Demolition, New Construction, Infrastructure
Pending Verification
$70,900,000 CJ est. value
Fort Lauderdale, FL 33316

RFQ - Redevelop the Existing East and West Buildings of the Fort Lauderdale Aquatic Complex
Demolition, New Construction, Infrastructure
Pending Verification
$70,900,000 CJ est. value
Fort Lauderdale, FL 33316

Waves Dania Beach Mixed-Use
New Construction, Infrastructure - 1,300,000 SF
Design
$200,000,000 CJ est. value
Dania Beach, FL 33004

Sixth and Rio
New Construction, Infrastructure - 7,969 SF
Post-Bid
$37,000,000 CJ est. value
Fort Lauderdale, FL 33301

River Oaks Stormwater Improvements (P11868)
Infrastructure
Results
$22,093,982 CJ est. value
Fort Lauderdale, FL 33301

Soleste Cityline
New Construction, Build-Out - 85,932 SF
Construction
$56,000,000 est. value
Dania Beach, FL 33004

New River Central
New Construction, Infrastructure - 5,697 SF
Pending Verification
$125,000,000 CJ est. value
Fort Lauderdale, FL 33301

Last Updated 10/03/2023 10:05 AM
Project Title

Nanas Preschool Apartments

Physical Address View project details and contacts
City, State (County) Hallandale Beach, FL 33009   (Broward County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Elementary School, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $26,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A developer wants to build an apartment complex with a ground-floor preschool in Hallandale Beach. To develop the 1.26-acre site at 106, 116, 120 and 124 S.E. 4th Ave. the project would feature a 17,000-square-foot school for Nana's Preschool on the ground floor, 63 apartments and 130 parking spaces. There would be 2,300 square feet of indoor amenities on the second floor and a pool deck on the third floor. The preschool would have an interior courtyard with a playground. As of October 2023, the project is pending Planning and Zoning Development Review for site plan approval. Information regarding a general contractor has not been disclosed. No construction timeline has been established at this time.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 117,010 SF - 5 Stories Above Grade, 97,710 SF, 130. 2,300 SF. 17,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting and Coating, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents