Similar Projects
Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Morgan's Glen Phases 1 and 2 (Site Civil) and Phase 3 (Earthwork)
Post-Bid
Sarasota, FL

Palmetto Park Road from Southwest 7th Avenue to Southwest 5th Avenue
Results
Less than $4,950,000 est. value
FL

Resurfacing Group 17-18
Results
Less than $4,950,000 est. value
FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Construction Services for Poitras East Community Development District
Post-Bid
FL

Portland Cement and General Contractor
Results
Less than $14,102,991 est. value
FL

Thompson Valley Road Resurfacing Project
Results
Less than $1,100,000 est. value
Monticello, FL

NE 2nd Way Roadway Improvements
Results
Trenton, FL 32693

Smith Creek Road Widening and Resurfacing Project
Results
Crawfordville, FL 32327

FDOT SCOP 2019 Carter Rd./NE 1st St. Roadway Improvements
Results
Less than $450,000 est. value
Lawtey, FL

Silver Springs Acres Road Grading
Term Contract
Results
Less than $38,000 est. value
FL

CR 236 Widening and Resurfacing
Results
Less than $693,313 est. value
FL

Bayou Drive Shoulder Repair
Results
FL

NW 32nd Ave Resurfacing
Results
Less than $900,000 est. value
FL

Last Updated 12/05/2019 04:19 AM
Project Title

Resurfacing

Physical Address View project details and contacts
City, State (County) FL   (Charlotte County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,748,140
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of milling and resurfacing, drainage improvements, curb and gutter, signalization, lighting, signing and pavement marking, sidewalks, and shoulder treatments on SR 776 from West of Placida Road easterly for 3.178 miles to Spinnaker Boulevard in Charlotte County, Florida. Section 0001 Roadway 0101- 1- Mobilization (43659715201) Ls 1.000 0102- 1- Maintenance Of Traffic (43659715201) Ls 1.000 0102- 14- Traffic Control Officer Hr 360.000 0102- 60- Work Zone Sign Ed 43,940.000 0102- 71- 13 Temporary Barrier, f&i, Low Profile, Concrete Lf 948.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 57,200.000 0102- 74- 7 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Lf 204.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 520.000 0102- 78- Temporary Retroreflective Pavement Marker Ea 1,524.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 548.000 0102-104- Temporary Signalization And Maintenance, Intersection Ed 1,300.000 0102-107- 1 Temporary Traffic Detection And Maintenance, Intersection Ed 1,300.000 0104- 10- 3 Sediment Barrier Lf 345.000 0104- 15- Soil Tracking Prevention Device Ea 3.000 0104- 18- Inlet Protection System Ea 148.000 0107- 1- Litter Removal Ac 278.230 0107- 2- Mowing Ac 203.900 0108- 1- Monitor Existing Structures- Inspection And Settlement Monitoring (43659715201) Ls 1.000 0108- 2- Monitor Existing Structures- Vibration Monitoring (43659715201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (43659715201) Ls 1.000 0110- 4- 10 Removal Of Existing Concrete Sy 1,361.000 0110- 7- 1 Mailbox, f&i Single Ea 3.000 0120- 1- Regular Excavation Cy 91.000 0120- 6- Embankment Cy 1,073.000 0160- 4- Type b Stabilization Sy 9,867.000 0327- 70- 4 Milling Exist Asph Pavt, 3" Avg Depth Sy 80,659.000 0327- 70- 6 Milling Exist Asph Pavt, 1 1/2" Avg Depth Sy 26,091.000 0327- 70- 15 Milling Exist Asph Pavt, 2 3/4" Avg Depth Sy 25,077.000 0327- 70- 19 Milling Exist Asph Pavt, 3/4" Avg Depth Sy 4,096.000 0334- 1- 13 Superpave Asphaltic Conc, Traffic c Tn 6,671.900 0334- 1- 53 Superpave Asphaltic Concrete, Traffic c, Pg76-22 Tn 2,758.400 0337- 7- 25 Asphalt Concrete Friction Course, Inc Bit, Fc-5, Pg 76-22 Tn 1,170.600 0337- 7- 83 Asphalt Concrete Friction Course,Traffic c, Fc-12.5, Pg 76- 22 Tn 8,509.600 0339- 1- Miscellaneous Asphalt Pavement Tn 92.100 0425- 1-883 Inlets, Barrier Wall, Rigid, Curb & Gutter, j Bot<10` Ea 1.000 0425- 11- Modify Existing Drainage Structure Ea 10.000 0430-175-124 Pipe Culvert,Optional Material,Round, 24"s/Cd Lf 8.000 0515- 2-111 Pedestrian / Bicycle Railing, Ns, 42" Type 1 Lf 545.000 0520- 1- 10 Concrete Curb & Gutter, Type f Lf 534.000 0521- 72- 43 Shoulder Concrete Barrier, Curb And Gutter Barrier Lf 751.000 0522- 1- Concrete Sidewalk And Driveways, 4" Thick Sy 142.000 0522- 2- Concrete Sidewalk And Driveways, 6" Thick Sy 356.000 0524- 1- 29 Concrete Ditch Pavement, 4", Reinforced Sy 336.000 0527- 2- Detectable Warnings Sf 1,002.000 0536- 1- 1 Guardrail -Roadway, General Tl-3 Lf 2,713.000 0536- 7- 3 Special Guardrail Post- Encased Post For Shallow Mount Ea 2.000 0536- 73- Guardrail Removal Lf 2,713.000 0536- 85- 20 Guardrail End Treatment- Trailing Anchorage Ea 2.000 0536- 85- 24 Guardrail End Treatment- Parallel Approach Terminal Ea 2.000 0570- 1- 2 Performance Turf, Sod Sy 15,923.000 0710- 11-101 Painted Pavement Markings, Standard, White, Solid, 6" Gm 6.683 0710- 11-102 Painted Pavement Markings, Standard, White, Solid For Interchange And Urban Island, 8" Gm 0.262 0710- 11-123 Painted Pavement Markings, Standard, White, Solid For Crosswalk And Roundabout, 12" Lf 6,337.000 0710- 11-124 Painted Pavement Markings, Standard, White, Solid For Diagonal Or Chevron, 18" Lf 170.000 0710- 11-125 Painted Pavement Markings, Standard, White, Solid For Stop Line Or Crosswalk, 24" Lf 1,109.000 0710- 11-131 Painted Pavement Markings, Standard, White, Skip, 10-30 Or 3-9 Skip, 6" Wide Gm 5.928 0710- 11-141 Painted Pavement Markings, Standard, White, 2-4 Dotted Guideline/ 6-10 Dotted Extension, 6" Gm 1.116 0710- 11-170 Painted Pavement Markings, Standard, White, Arrows Ea 122.000 0710- 11-201 Painted Pavement Markings, Standard, Yellow, Solid, 6" Gm 6.408 0710- 11-224 Painted Pavement Markings, Standard, Yellow, Solid For Diagonal Or Chevron, 18" Lf 241.000 0710- 11-241 Painted Pavement Markings, Standard, Yellow, 2-4 Dotted Guideline/6-10 Dotted Extension, 6" Gm 0.827 Section 0002 Signing 0700- 1- 11 Single Post Sign, f&i Ground Mount, Up To 12 Sf As 115.000 0700- 1- 12 Single Post Sign, f&i Ground Mount, 12-20 Sf As 24.000 0700- 1- 13 Single Post Sign, f&i Ground Mount, 21-30 Sf As 10.000 0700- 1- 60 Single Post Sign, Remove As 122.000 0700- 2- 14 Multi- Post Sign, f&i Ground Mount, 31-50 Sf As 1.000 0700- 2- 16 Multi- Post Sign, f&i Ground Mount, 101-200 Sf As 1.000 0700- 2- 60 Multi- Post Sign, Remove As 9.000 0700- 3-201 Sign Panel, Furnish & Install Overhead Mount, Up To 12 Sf (Signals) Ea 5.000 0700- 3-601 Sign Panel, Remove, Up To 12 Sf (Signals) Ea 4.000 0700- 3-602 Sign Panel, Remove, 12-20 Sf (Signals) Ea 10.000 0700- 5- 22 Internally Illuminated Sign, Furnish & Install, Overhead Mount, 12-18 Sf (Signals) Ea 16.000 0701- 18-101 Profiled Thermoplastic,Standard- Asphalt Surfaces, White, Solid,6" Gm 1.425 0701- 18-201 Profiled Thermoplastic,Standard- Asphalt Surfaces, Yellow, Solid,6" Gm 0.867 0705- 10- 2 Object Marker, Type 2 Ea 1.000 0705- 11- 1 Delineator, Flexible Tubular Ea 4.000 0710- 11-190 Painted Pavement Markings, Standard, White, Island Nose Sf 29.000 0710- 11-290 Painted Pavement Markings, Standard, Yellow, Island Nose Sf 1,863.000 0710- 90- Painted Pavement Markings, Final Surface (43659715201) Ls 1.000 0711- 11-123 Thermoplastic, Standard, White, Solid, 12" For Crosswalk And Roundabout Lf 6,337.000 0711- 11-124 Thermoplastic, Standard, White, Solid, 18" For Diagonals And Chevrons Lf 170.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" For Stop Line And Crosswalk Lf 1,109.000 0711- 11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10 Gap Extension, 6" Gm 1.116 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 122.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" For Diagonal Or Chevron Lf 241.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6- 10 Dotted Extension Line, 6" Gm 0.827 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" For Crosswalk Lf 3,091.000 0711- 14-160 Thermoplastic, Preformed, White, Message Ea 67.000 0711- 14-170 Thermoplastic, Preformed, White, Arrow Ea 67.000 0711- 15-101 Thermoplastic, Standard-Open Graded Asphalt Surfaces White, Solid, 6" Gm 0.287 0711- 15-102 Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Solid, 8" Gm 0.122 0711- 15-131 Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Skip, 6",10-30 Skip Or 3-9 Lane Drop Gm 1.497 0711- 15-201 Thermoplastic, Standard-Open Graded Asphalt Surfaces, Yellow, Solid, 6" Gm 1.490 101 Permanent Tape, White, Solid, 6" For Concrete Bridges Gm 0.101 0713-103-131 Permanent Tape, White, Skip/Dotted, 6" For Concrete Surfaces Gm 0.106 0713-103-201 Permanent Tape, Yellow, Solid, 6" For Concrete Bridges Gm 0.101 Section 0003 Lighting 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 835.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 420.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 27.000 0715- 1- 12 Lighting Conductors, f&i, Insulated, No.8 - 6 Lf 4,420.000 0715- 4- 14 Light Pole Complete, Furnish & Install Standard Pole Standard Foundation, 45` Mounting Height Ea 12.000 0715- 4- 33 Light Pole Complete, Furnish & Install Utility Conflict Pole, Index 17515/715-002 Foundation, 40` Mounting Height Ea 1.000 0715- 4- 34 Light Pole Complete, Furnish & Install Utility Conflict Pole, Index 17515/715-002 Foundation, 45` Mounting Height Ea 1.000 0715- 4- 43 Light Pole Complete, Furnish & Install Utility Conflict Pole, Special Foundation, 40` Mounting Height Ea 5.000 0715- 4- 70 Light Pole Complete, Remove Pole And Foundation Ea 2.000 0715-500- 1 Pole Cable Distribution System, Furnish And Install, Conventional Ea 19.000 Section 0004 Signalization 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 1,221.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 3,388.000 0632- 7- 1 Signal Cable- New Or Reconstructed Intersection, Furnish & Install Pi 4.000 0632- 7- 6 Signal Cable, Remove- Intersection Pi 4.000 0635- 2- 12 Pull & Splice Box, f&i, 24" x 36" Cover Size Ea 98.000 0646- 1- 11 Aluminum Signals Pole, Pedestal Ea 17.000 0646- 1- 60 Aluminum Signals Pole, Remove Ea 12.000 0649- 21-111 Steel Mast Arm Assembly, f&i, Single, Special Length Drilled Shaft, Project 436597-1-52-01 (43659715201) Ea 1.000 0649- 21-112 Steel Mast Arm Assembly, f&i, Single, Special Length Drilled Shaft, Project 436597-1-52-01 (43659715201) Ea 1.000 0649- 21-113 Steel Mast Arm Assembly, f&i, Single, Special Length Drilled Shaft, Project 436597-1-52-01 (43659715201) Ea 1.000 0649- 21-114 Steel Mast Arm Assembly, f&i, Single, Special Length Drilled Shaft, Project 436597-1-52-01 (43659715201) Ea 1.000 0649- 21-115 Steel Mast Arm Assembly, f&i, Double, Special Length Drilled Shaft, Project 436597-1-52-01 (43659715201) Ea 1.000 0649- 21-116 Steel Mast Arm Assembly, f&i, 66` & 51` Double, Special Length Drilled Shaft, Project 436597-1-52-01 (43659715201) Ea 1.000 0649- 21-117 Steel Mast Arm Assembly, f&i, 30` Single, Special Length Drilled Shaft, Project 436597-1-52-01 (43659715201) Ea 1.000 0649- 21-118 Steel Mast Arm Assembly, f&i, 50` Single, Special Length Drilled Shaft, Project 436597-1-52-01 (43659715201) Ea 1.000 0649- 21-119 Steel Mast Arm Assembly, f&i, 65` Single, Special Length Drilled Shaft, Project 436597-1-52-01 (43659715201) Ea 1.000 0649- 21-120 Steel Mast Arm Assembly, f&i, 51` Single, Special Length Drilled Shaft, Project 436597-1-52-01 (43659715201) Ea 1.000 0649- 26- 5 Steel Mast Arm Assembly, Remove, Deep Foundation- Bolt On Attachment a 12.000 0650- 1- 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 Way As 39.000 0650- 1- 16 Vehicular Traffic Signal, Furnish & Install Aluminum, 4 Section, 1 Way As 6.000 0650- 1- 60 Vehicular Traffic Signal, Remove- Poles To Remain As 4.000 0653- 1- 11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way As 8.000 0653- 1- 12 Pedestrian Signal, Furnish & Install Led Countdown, 2 Ways As 10.000 0660- 1-109 Loop Detector Inductive, f&i, Type 9 Ea 18.000 0660- 2-102 Loop Assembly, f&i, Type b As 36.000 0660- 4- 11 Vehicle Detection System- Video, Furnish & Install Cabinet Equipment Ea 16.000 0660- 4- 12 Vehicle Detection System- Video, Furnish & Install Above Ground Equipment Ea 16.000 0665- 1- 11 Pedestrian Detector, Furnish & Install, Standard Ea 26.000 0670- 5-400 Traffic Controller Assembly, Modify As 4.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 26 - Electrical, Exterior Lighting.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents