Similar Projects
Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

Mount Vernon Complete roof tear off and replacement
Renovation
Design
$300,000 CJ est. value
Chicago, IL 60643

2023 Roof Replacement John Laidlaw Elementary School
Renovation
Sub-Bidding
$700,000 CJ est. value
Western Springs, IL 60558

Roof Repairs at Holmes Middle School
Renovation
Sub-Bidding
$1,300,000 CJ est. value
Wheeling, IL 60090

Marquette Park - Fieldhouse & Landscape Buildings - Roof Replacements
Alteration
Post-Bid
Chicago, IL 60629

Replace/Repair Roofing Systems at Multiple Sites
Alteration
Post-Bid
Less than $250,000 est. value

MCC Chicago - Replace Rooftop Rec
Results
$250,000 to $500,000 est. value
Chicago, IL 60605

Roof Replacement at Southeast Police
Alteration
Results
IL

West Meadows Ice Arena Roof Rehabilitation
Renovation
Post-Bid
Rolling Meadows, IL 60008

Roof Replacement River Grove Public Library
Alteration
Results
River Grove, IL 60171

Mechanical Rooftop Equipment Replacement and Roof Upgrade
Alteration
Post-Bid
Schaumburg, IL 60173

Roof Replacement Harker Water Plant
Alteration
Results
Oak Lawn, IL 60453

Roof Renovation at their Middle School in Brookfield
Alteration
Post-Bid
Brookfield, IL 60513

2022 Roof Repairs at Multiple Sites
Alteration
Results
Palatine, IL 60074

2022 Roofing Upgrades
Alteration
Post-Bid
Berwyn, IL 60402

Last Updated 05/10/2023 11:07 AM
Project Title

2023 Roof Safety Improvements Project

Physical Address View project details and contacts
City, State (County) Palatine, IL 60067   (Cook County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $205,750 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of installing roof safety improvements including but not limited to the following: modifying roof access ladders, installing non-penetrating rooftop railing assemblies, modification of mobile non-penetrating weighted fall restraint anchorage systems, and installing & relocating roof walkway pads. All questions regarding the Bidding Documents shall be submitted to the Architect via email and / or fax to both Jewell Jackson (purchasing@harpercollege.edu) and Scott Steingraeber (ssteingraeber@legat.com). Replies will be issued to all bidders of record in the form of an Addendum. Questions received later than 12:00 p.m. on February 25, 2023 may not be answered. Bid security in the form of bid bond in an amount equal to 10 percent (10%) of the aggregate of the Base Bid amount and all Alternate Bid amounts shall be submitted with the bid. Performance, Labor and Material Payment Bonds, and Certificate of Insurance will be required from the successful bidder. Bids shall be submitted in an opaque sealed envelope addressed to: Harper College, Purchasing Department, located in A-Building, Room A217, 1200 W. Algonquin Road, Palatine, Illinois 60067. No bid may be withdrawn for a period of ninety days after the submission without the consent of the Board of Trustees. Any bid submitted unsealed, unsigned, fax transmission, e-mail, or received subsequent to the aforementioned date and time, may be disqualified and returned to the bidder. Harper College reserves the right to reject any or all bids or parts thereof, to waive any irregularities or informalities in bidding procedures, and to award the contract in a manner best serving the interest of the College. All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all Contractors working on public works. Bidder must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunity Laws. Contractors shall pay not less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). Bidders shall comply with the Business Enterprise Program: Participation and Utilization Plan developed by Harper College. There is a 30 percent aspirational goal on the Contract.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents