Similar Projects
Arlington - Columbus Const / Cold in - Place Recycle
Infrastructure
Conception
$8,000,000 to $8,999,999 est. value
Arlington, WI 53911

Road Bid - Klappstein Road
Infrastructure
Bidding
$180,000 est. value
Portage, WI 53901

Columbia County Road Improvements
Renovation
Post-Bid
Columbus, WI

2021 Chip Seal
Post-Bid
$82,938 est. value
Portage, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Wisconsin Dells - Adams, Columbia Co Line - Golden Avenue
Results
Wisconsin Dells, WI 53965

2021 Pavement Rehabilitation
Post-Bid
$186,388 est. value
Portage, WI

Reedsburg - Wisconsin Dells, N. Jct. STH 33 Intersection, Reedsburg -Wisconsin Dells, Copper Springs Road to N. Jct. STH 33, Reedsburg - Baraboo,N. Jct. STH 23 to USH 12
Results
Baraboo, Reedsburg, Wisconsin Dells, WI

Crack Fill, Emulsified Sealer/Binder and Pavement Marking
Post-Bid
Wisconsin Dells, WI 53965

Portage - Fox Lake, STH 22 to 0.19 MI. W. of Morris Drive, Pardeeville - Manchester, CTH P to STH 33
Results
Fox Lake, Pardeeville, Portage, WI 53954

Resurfacing Barry Road
Post-Bid
Pardeeville, WI

Geogrid Asphalt Pavement Design Alternatives
Results
Portage, WI

2021 Messer Road Repair
Infrastructure
Post-Bid
WI

Polymer Overlay for Bridge Decks
Results
Portage, WI

2021 Crack Sealing Program
Infrastructure
Post-Bid
$20,000 est. value
Columbus, WI 53925

Last Updated 07/04/2022 12:25 AM
Project Title

West Bush Road Improvements

Physical Address View project details and contacts
City, State (County) Pardeeville, Wyocena, WI 53954   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: Erosion control, traffic control, replacement of 64 LF of 18-inch CMP culvert crossings; 9000 SY of pulverize and regrading existing asphalt pavement, 2025 Ton of dense graded base, 1935 Ton of asphalt pavement, 8000 LF of gravel shouldering; and all other related work for project completion.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents