Last Updated | 08/09/2022 05:33 PM |
Project Title | Bear Creek Interceptor Relief Phase 1 (Downstream) |
Physical Address | View project details and contacts |
City, State (County) | Grand Prairie, TX 75050 (Dallas County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $749,400 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 2022, this project is set to go before the Board of Directors in October 2022 Replacement of parallel 54- and 84-inch unlined reinforced concrete pipe with a single non-corrosive interceptor along Bear Creek from Hunter Ferrell Road to IH-30. Phase 1 includes 8840 LF of 84- to 96-inch interceptor / four siphons / and replacement of meter stations MS1_0B and MS2_0B. The Bear Creek Interceptor converges with the West Fork Interceptor at the downstream limits of Phase 1 improvements. The project limits were amended to include 5000 LF of 110-inch realignment of the West Fork Interceptor Segment WF-G following an emergency repair of the pipeline due to slope embankment failure in March 2020. Estimated Construction Cost in Millions: over $40 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |