Similar Projects
Bennett Street Water Line Replacement - City of Cedar Hill
Infrastructure
Conception
$300,000 est. value
Cedar Hill, TX

Carissa Drive from Ridgelake Drive to Sunland Street - V763 - City of Dallas
Infrastructure
Conception
$214,855 CJ est. value
Dallas, TX 75218

Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Bishop Arts Phase 2
New Construction, Infrastructure - 10,000 SF
Design
$43,000,000 CJ est. value
Dallas, TX 75208

RFQ Construction Manager at Risk - Recreation and Indoor Aquatic Centers
New Construction, Infrastructure - 80,000 SF
Bidding
$53,000,000 CJ est. value
Desoto, TX 75115

Epic Central Maintenance Building
New Construction, Infrastructure
Bidding
$240,000 CJ est. value
Grand Prairie, TX 75050

Storm and Wastewater Systems Cleaning, Inspection and Reporting
Term Contract
Sub-Bidding
Irving, TX 75061

SL0012 - Reflectorized Pavement Markings and Markers
Infrastructure
Sub-Bidding
$1,221,590 CJ est. value
Dallas, TX 75241

Trinity Crossing Phase 6A Utility Improvements
Post-Bid
Mesquite, TX

Ductile Iron Pipe
Term Contract
Post-Bid
Dallas, TX

Crockett Park Dog Park - Site Development
Results
$531,150 est. value
Dallas, TX

Elmwood Parkway Trail - Phase Three - Site Development
Results
$894,400 est. value
Dallas, TX

Irving Mall Site Work
Renovation - 767,000 SF
Construction
Irving, TX 75062

Salad and Go - Marsh & Walnut Hill / Dallas
New Construction, Infrastructure - 767 SF
Construction
$300,000 CJ est. value
Dallas, TX 75229

Kohls Sephora Renovation #748 / Amarillo
Demolition, Renovation, Infrastructure - 2,500 SF
Pending Verification
$300,000 CJ est. value
Amarillo, TX 79124

Last Updated 08/09/2022 05:33 PM
Project Title

Bear Creek Interceptor Relief Phase 1 (Downstream)

Physical Address View project details and contacts
City, State (County) Grand Prairie, TX 75050   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $749,400 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 2022, this project is set to go before the Board of Directors in October 2022 Replacement of parallel 54- and 84-inch unlined reinforced concrete pipe with a single non-corrosive interceptor along Bear Creek from Hunter Ferrell Road to IH-30. Phase 1 includes 8840 LF of 84- to 96-inch interceptor / four siphons / and replacement of meter stations MS1_0B and MS2_0B. The Bear Creek Interceptor converges with the West Fork Interceptor at the downstream limits of Phase 1 improvements. The project limits were amended to include 5000 LF of 110-inch realignment of the West Fork Interceptor Segment WF-G following an emergency repair of the pipeline due to slope embankment failure in March 2020. Estimated Construction Cost in Millions: over $40

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents