Similar Projects
FM 1189 - Intersection and Operational Improvements
Infrastructure
Bidding
$450,469 est. value
TX

Annual Asphalt Pavement Resurfacing Services
Term Contract
Post-Bid
Weatherford, TX

Springtown CDBG - Avenue D Reconstruction
Infrastructure
Post-Bid
$250,000 to $500,000 est. value
Springtown, TX

Southern Region Disaster Recovery Support BPA
Results

East Loop Phase III - North Bend Rd to FM 730
Results
Weatherford, TX 76086

Street Rehabilitation Program
Infrastructure
Post-Bid
Azle, TX

Asphalt and Concrete Repairs
Term Contract
Results
Weatherford, TX 76086

East Loop Ph. 5 & 6 US 180 & FM 730 Widening
Results
$1,982,544 est. value
Weatherford, TX 76086

Resurface Roadway
Results
Less than $9,525,875 est. value
TX

Jenkins Road Traffic Safety
Results
TX

Proposed Roadway Construction for Kelly Road Realignment
Results
$787,720 est. value
Aledo, TX 76087

East Loop Ph IV FM 51 to Northbend
Results
Weatherford, TX

Reconstruct Existing Roadway
Results
$1,148,856 est. value
TX

2021 Group Seal Coat Program
Results

2021 Paving Improvements
Infrastructure
Results
Aledo, TX

Last Updated 01/08/2022 12:44 AM
Project Title

FM 3325 - Intersection Improvements With Right and/or Left T

Physical Address View project details and contacts
City, State (County) TX   (Parker County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $929,691
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 11.000 1 105 6033 Removing Stb Base And Asph Pav(10-14") Sy 1,083.000 2 110 6001 Excavation (Roadway) Cy 2,707.000 3 132 6002 Embankment (Final)(Dens Cont)(Ty a) Cy 3,393.000 4 134 6001 Backfill (Ty a) Sta 18.000 5 164 6015 Straw/Hay Mlch Seed(Perm)(Rural)(Clay) Sy 2,769.000 6 164 6049 Straw/Hay Mlch Seed(Temp)(Cool) Sy 2,769.000 7 168 6001 Vegetative Watering Mg 97.000 8 310 6001 Prime Coat (Multi Option) Gal 465.000 9 316 6001 Asph (Multi Option) Gal 3,690.000 10 316 6175 Aggr(Ty-b Gr-4 Sac-b) Cy 84.000 11 340 6239 d-Gr Hma(Sq) Ty-b Sac-b Pg64-22 Ton 1,203.000 12 351 6007 Flexible Pavement Structure Repair(11") Sy 640.000 13 500 6001 Mobilization Ls 1.000 14 502 6001 Barricades, Signs And Traffic Handling Mo 2.000 15 506 6038 Temp Sedmt Cont Fence (Install) Lf 1,000.000 16 506 6039 Temp Sedmt Cont Fence (Remove) Lf 1,000.000 17 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 200.000 18 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 200.000 19 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 4.000 20 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(t) Ea 4.000 21 644 6068 Relocate Sm Rd Sn Sup&Am Ty 10bwg Ea 1.000 22 644 6076 Remove Sm Rd Sn Sup&Am Ea 4.000 23 662 6004 Wk Zn Pav Mrk Non-Remov (w)4"(Sld) Lf 3,476.000 24 662 6012 Wk Zn Pav Mrk Non-Remov (w)8"(Sld) Lf 1,105.000 25 662 6034 Wk Zn Pav Mrk Non-Remov (y)4"(Sld) Lf 6,048.000 26 662 6063 Wk Zn Pav Mrk Remov (w)4"(Sld) Lf 4,000.000 27 662 6095 Wk Zn Pav Mrk Remov (y)4"(Sld) Lf 4,000.000 28 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty w Ea 58.000 29 662 6110 Wk Zn Pav Mrk Sht Term (Tab)Ty y Ea 620.000 30 666 6030 Refl Pav Mrk Ty i (w)8"(Dot)(100mil) Lf 265.000 31 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 1,105.000 32 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 13.000 33 666 6054 Refl Pav Mrk Ty i (w)(Arrow)(100mil) Ea 7.000 34 666 6078 Refl Pav Mrk Ty i (w)(Word)(100mil) Ea 6.000 35 666 6141 Refl Pav Mrk Ty i (y)12"(Sld)(100mil) Lf 640.000 36 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 3,476.000 37 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 6,048.000 38 672 6007 Refl Pav Mrkr Ty i-c Ea 58.000 39 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 310.000 40 752 6005 Tree Removal (4" - 12" Dia) Ea 4.000 41 752 6006 Tree Removal (12" - 18" Dia) Ea 12.000 42 752 6007 Tree Removal (18" - 24" Dia) Ea 3.000 43 752 6008 Tree Removal (24" - 30" Dia) Ea 3.000 44 760 6001 Ditch Cleaning And Reshaping (Foot) Lf 1,066.000 45 3077 6027 Sp Mixes Sp-c Sac-a Pg70-28 Ton 1,328.000 46 3077 6075 Tack Coat Gal 1,732.000 47 6001 6001 Portable Changeable Message Sign Day 90.000 48 6185 6002 Tma (Stationary) Day 76.000 49

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents