Similar Projects
Baseline Road Trailhead Improvements - PRC202007 - County of Marion
Infrastructure
Conception
$825,000 CJ est. value
Ocala, FL 34472

Ray Wayside Site Improvements - PRC202006 - County of Marion
Renovation, Infrastructure
Conception
$899,801 CJ est. value
Silver Springs, FL 34488

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Design
$300,000 CJ est. value
Ocala, FL 34475

Murphy USA #7128 / Ocala
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$1,500,000 CJ est. value
Ocala, FL 34471

Pool Slide Replacement at Jervey Gannt
Infrastructure
Bidding
$300,000 CJ est. value
Ocala, FL 34470

SW 49th Ave North Phase Road Project - Demolition
Infrastructure
Bidding
$15,000 CJ est. value
Ocala, FL 34476

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Y--Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Firm Fixed Price Multiple Award Construction Contract, NAVFAC SE Area of Operations
Results
$20,000,000 to $900,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Watermark / Summerfield
New Construction, Infrastructure - 79,000 SF
Pending Verification
$143,100,000 CJ est. value
Summerfield, FL 34491

Robinson Street and 107th Street Apartments
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Belleview, FL 34420

Southwest 49th/40th Avenue Phase 1 - County of Marion
Infrastructure
Conception
$6,800,000 CJ est. value
Ocala, FL 34474

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Last Updated 07/03/2023 03:33 PM
Project Title

Fire EMS Ocala Central - FRC000007 - Marion County

Physical Address View project details and contacts
City, State (County) Ocala, FL 34471   (Marion County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $4,012,065 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

You are invited to bid on the scope of work within your area of expertise. All bids must include the complete cost of all labor, overtime, materials, equipment, taxes, appurtenances, and customary inclusions to provide the full scope of work and a complete project. Add Performance and Payment Bond: Subcontractors must include an alternate to provide a payment and performance bond for 100% of the base bid amount BONDING REQUIREMENTS Bid security is not required; however, the subcontractor must honor the proposal up to 90 days. Subcontractors must include an alternate to provide a payment and performance bond for 100% of the base bid amount. NON-MANDATORY Subcontractors are to base their proposals on the information provided. The CM will also gladly meet and review the project with interested subs with a scheduled appointment. All RFIs must go through Dinkins Construction. No exceptions. Send RFI's to : Phillip.wagoner@dinkinsconstruction.com

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents