Similar Projects
District 2243
New Construction - 4,510,000 SF
Conception
$10,000,000 CJ est. value
Leander, TX 78641

District 2243
New Construction - 4,510,000 SF
Conception
$10,000,000 CJ est. value
Leander, TX 78641

American Furniture Warehouse
New Construction - 443,375 SF
Design
TX

Norman International Warehouse
Addition - 132,000 SF
Design
Lewisville, TX 75067

Design Build Services for Restoration of SEA District Water Gardens
New Construction
Bidding
$4,000,000 est. value
Corpus Christi, TX

Travis County Correctional Complex New Evidence Warehouse
New Construction
Bidding
Del Valle, TX 78617

Anew Business Solutions Office & Warehouse
New Construction - 70,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Justin, TX 76247

Costco Warehouse
New Construction - 157,961 SF
Post-Bid
San Antonio, TX 78254

McAllen Central Processing Center (CPC), McAllen, Texas
Renovation, Demolition - 22,000 SF
Results
$10,000,000 to $25,000,000 est. value
McAllen, TX

Metal Shelters
Results
Edinburg, TX 78541

Buckingham Road Development
New Construction - 38,900 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Richardson, TX 75081

Energy Rental Solutions - CAT
New Construction - 7,116 SF
Construction
$4,000,000 est. value
Pearland, TX 77581

Amazon Sorting Center
Build-Out - 307,840 SF
Pending Verification
Kyle, TX 78640

Gap Distribution Center
New Construction
Pending Verification
Rosenberg, TX

Surplus Storage Facility
New Construction
Conception
Canutillo, TX

Last Updated 11/05/2021 10:51 AM
Project Title

General Contractor to provide Construction Services for Three Concrete Storm Shelters at Caddo Mounds SHS

Physical Address View project details and contacts
City, State (County) Alto, TX 75925   (Cherokee County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $43,243
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Turn-key project for construction and installation of three pre-engineered above ground concrete storm shelters on concrete slab foundations (two for 4-6 persons and one for 13-16 persons). The shelters’ design and construction shall be certified to meet the National Storm Shelter Association (NSSA) and ICC standards and satisfy FEMA 320 and FEMA 361 requirements.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents